ELECTRIFI-
CATION

BUILDING EFFICIENCY/ RENEWABLES
FlexPath: Single Family Alterations
Whole Building
Equipment-Specific

ELECTRIFI-
CATION
Air Conditioner Replacements (AC to HP)
Electric Readiness:
Pre-Wiring
Panel Upgrade
EV Charging Readiness

ENERGY PLUS WATER
Right-sizing Plumbing
Water Reuse
Water Neutral Development

INFORMATION DISCLOSURE
Audits
Benchmarking

PROCESS LOADS
Commercial Kitchens
Elevators
Escalators
Controlled Environment Horticulture
Single Family Air Conditioner Replacements (SF AC to HP)
- Helps accelerate heat pump adoption
- Eliminates site GHG emissions associated with space heating
- Some existing site conditions may present implementation challenges
- Requires significant stakeholder education on benefits
View and Download Resources
Application Package, Internal Staff Resources, Implementation
Application Package
Internal Staff Resources
Nonresidential Air Conditioner Replacements (NR AC to HP)
Require heat pump or efficiency measures when replacing packaged rooftop air conditioners in nonresidential buildings.
- Encourages installation of heat pumps when replacing HVAC systems.
- Applies only to HVAC systems with capacity less than 20 tons
View and Download Resources
Application Package, Internal Staff Resources, Implementation
Application Package
Internal Staff Resources
Electric Vehicle Requirements
- No need for cost-effectiveness study or CEC approval
- Low-cost opportunity to reduce the barriers to clean transportation access in workplace and public locations
- Future retrofits to accomdate EV charing infrastructure could be costly or prohibitive
- No direct energy savings associated with enabling measures
View and Download Resources
Application Package, Internal Staff Resources, Implementation
Internal Staff Resources
Implementation
All-Electric (Municipal Code Amendment)
Require all-electric new construction projects with no gas appliances or gas plumbing, through amending the zoning, health and safety, or other municipal code
- Maximum reduction in emissions
- Flexibility to adopt outside Title 24, Part 6
- No need for cost-effectiveness study or CEC approval
- Requires more community outreach and education than other structures
- Uncertainty regarding existing legal challenges
- Technical feasibility for some occupancies
View and Download Resources
Application Package, Internal Staff Resources, Implementation
Application Package
Internal Staff Resources
- Exceptions in All-Electric Ordinances
- 2022 Single Family New Con Analysis - Executive Summary
- 2022 Single Family New Construction Study Data
- 2022 Multifamily NewCon Analysis - Executive Summary
- 2022 Multifamily New Construction Study Data
- 2022 Nonresidential New Con Analysis-Executive Summary
- 2022 Nonresidential New Construction Study Data
Implementation
Sorry
Sorry, but there were no matching elements found.
Sorry
Sorry, but there were no elements found at all.