Reach Code Paths

ELECTRIFI-
CATION

Select a different type

Ordinance Type:

Occupancy:

 
Requirement
Pros
Cons
Adopter City

Single Family Air Conditioner Replacements (SF AC to HP)

  • Helps accelerate heat pump adoption
  • Eliminates site GHG emissions associated with space heating
  • Some existing site conditions may present implementation challenges
  • Requires significant stakeholder education on benefits
Moreno Valley Mountain View Palo Alto

View and Download Resources

Application Package, Internal Staff Resources, Implementation


Nonresidential Air Conditioner Replacements (NR AC to HP)

Require heat pump or efficiency measures when replacing packaged rooftop air conditioners in nonresidential buildings.

  • Encourages installation of heat pumps when replacing HVAC systems.
  • Applies only to HVAC systems with capacity less than 20 tons
Your city could be the first to adopt this ordinance

View and Download Resources

Application Package, Internal Staff Resources, Implementation


Electric Vehicle Requirements

  • No need for cost-effectiveness study or CEC approval
  • Low-cost opportunity to reduce the barriers to clean transportation access in workplace and public locations
  • Future retrofits to accomdate EV charing infrastructure could be costly or prohibitive
  • No direct energy savings associated with enabling measures
Your city could be the first to adopt this ordinance

View and Download Resources

Application Package, Internal Staff Resources, Implementation


All-Electric (Municipal Code Amendment)

Require all-electric new construction projects with no gas appliances or gas plumbing, through amending the zoning, health and safety, or other municipal code

  • Maximum reduction in emissions
  • Flexibility to adopt outside Title 24, Part 6
  • No need for cost-effectiveness study or CEC approval
  • Requires more community outreach and education than other structures
  • Uncertainty regarding existing legal challenges
  • Technical feasibility for some occupancies
Your city could be the first to adopt this ordinance

View and Download Resources

Application Package, Internal Staff Resources, Implementation


Sorry

Sorry, but there were no matching elements found.

Sorry

Sorry, but there were no elements found at all.

last updated

  • SDGE - A Sempra Energy Utility
  • Southern California Edison - An EDISON INTERNATIONAL® Company
  • PG&E Corporation

form will go here