Reach Code Paths

PROCESS LOADS

Select a different type

Ordinance Type:

Occupancy:

 
Requirement
Pros
Cons
Adopter City

Commercial Kitchens: Non-federally regulated equipment: all high efficiency, AND/OR Water-savings measures, AND/OR Electrification

For example, electrification of new commercial kitchens that require no natural gas or propane appliances or improving the efficiency of eligible equipment

  • Water savings in addition to energy
  • Potential for significant GHG emissions reductions
  • Resistance to electrifying cooking equipment
Your city could be the first to adopt this ordinance

View and Download Resources

Application Package, Internal Staff Resources, Implementation


Controlled Environment Horticulture: Efficient lighting and HVAC technologies and controls

LED lighting systems reduce energy use and the amount of heat generated, also reducing the energy required to cool the facility

  • Growing industry with significant energy savings and GHG emissions reductions potential
  • Owner resistance to changes that could impact crop
Your city could be the first to adopt this ordinance

View and Download Resources

Application Package, Internal Staff Resources, Implementation


There are no resources for this requirement.
Contact us for more information.
Learn more about the Reach Code Process.

Elevators: Require upgrade by “Date-Certain”, a date specified in the policy OR renovations OR upon major maintenance activities

Upgrade elevators in existing buildings to meet or exceed current Title 24, Part 6 requirements for lighting power density, ventilation fan power performance and shutoff controls

  • Reduce energy consumption when not in use
  • Controls are common retrofit measures
  • Typically not a large energy end-use, and not high priority
Your city could be the first to adopt this ordinance

View and Download Resources

Application Package, Internal Staff Resources, Implementation


There are no resources for this requirement.
Contact us for more information.
Learn more about the Reach Code Process.

Escalators: Require upgrade by “Date-Certain”, a date specified in the policy OR renovations OR upon major maintenance activities

Upgrade escalators in existing buildings to meet current Title 24, Part 6 requirements for minimum speed control when not conveying passengers

  • Reduce energy consumption when not in use
  • Limited applicability
Your city could be the first to adopt this ordinance

View and Download Resources

Application Package, Internal Staff Resources, Implementation


There are no resources for this requirement.
Contact us for more information.
Learn more about the Reach Code Process.

Sorry

Sorry, but there were no matching elements found.

Sorry

Sorry, but there were no elements found at all.

last updated

  • SDGE - A Sempra Energy Utility
  • Southern California Edison - An EDISON INTERNATIONAL® Company
  • PG&E Corporation

form will go here