No matching adoptions found
We couldn't find any adoptions that matched your search. Try searching the entire site for more results.
No adoptions have been added yet
Sorry, but you got here faster than we were able to add items. Please check back soon.
Jurisdiction | Ord. Type | Adopted Date | Single Family | Multifamily | Nonresidential | Exceptions | Ordinance |
---|---|---|---|---|---|---|---|
Brisbane | EE |
The proposed building design for newly constructed buildings must have a source energy (EDR 1) compliance margin of at least 9 points. Expanded electric-readiness requirements for all mixed-fuel buildings. A newly constructed building with less than 1,500 square feet of floor area shall achieve a source energy compliance margin of at least 4 points. |
The proposed building design for newly constructed buildings must have a source energy (EDR 1) compliance margin of at least 10 percent for low-rise multifamily buildings; and 4 percent for high-rise multifamily buildings. Expanded electric-readiness requirements for all mixed-fuel buildings. |
The proposed building design for newly constructed buildings must have a source energy (EDR 1) compliance margin of at least 7 percent for all nonresidential occupancies. Expanded electric-readiness requirements for all mixed-fuel buildings. The compliance margin is not required for nonresidential occupancies that are designed with single zone space-conditioning systems. |
|||
Burbank | EE |
New and Re-roof: Low-slope; 3 Year Aged- Solar Reflectance > 0.65, Thermal Emittance > 0.85, SRI > 78 Steep-slope; 3 Year Aged- Solar Reflectance > 0.23, Thermal Emittance > 0.85, SRI > 20 |
High-rise Residential/ Hotel and Motel - New and Re-roof: Low-slope; 3 Year Aged- Solar Reflectance > 0.65, Thermal Emittance > 0.75, SRI > 78 Steep-slope; 3 Year Aged- Solar Reflectance > 0.23, Thermal Emittance > 0.75, SRI > 20 |
New and Re-roof: Low-slope; 3 Year Aged- Solar Reflectance > 0.68, Thermal Emittance > 0.85, SRI > 82 Steep-slope; 3 Year Aged- Solar Reflectance > 0.23, Thermal Emittance > 0.85, SRI > 27 |
Roof repair, PV installation, vegetated roofs (25 lbs/square foot) |
||
Carlsbad | PV |
|
Additions: existing multifamily buildings where the total roof area is increased by at least 2,000 square feet OR alterations with a permit valuation of at least $1,000,000 that affect at least 75 percent of the gross floor area: buildings over 10k sq. ft. shall install a minimum PV system sized at 15 kW per 10k sq. ft. of gross floor area / buildings under 10k sq. ft. shall install a minimum 5 kW PV system.
|
Additions: existing nonresidential and hotel/motel buildings where the total roof area is increased by at least 2,000 square feet OR alterations with a permit valuation of at least $1,000,000 that affect at least 75 percent of the gross floor area: buildings over 10k sq. ft. shall install a minimum PV system sized at 15 kW per 10k sq. ft. of gross floor area / buildings under 10k sq. ft. shall install a minimum 5 kW PV system. |
|
||
EE |
All newly constructed buildings shall install a service water-heating system that provides 60% of the energy needed from on-site solar energy (PV or solar water-heating) or recovered energy. Additions/Alterations: permit value greater than $60,000 shall include prescriptive energy efficiency measures depending on building vintage. |
Additions/Alterations: permit value greater than $60,000 shall include prescriptive energy efficiency measures depending on building vintage. |
All newly constructed nonresidential buildings shall install a HPWH, electric resistance water heater, or a solar water-heating system with a minimum solar savings fraction of 0.40 |
|
|||
Corte Madera | EE |
Additions/Alterations: Projects greater than 750 square feet of floor area shall install a set of measures to achieve a target score from a weighted menu of measures; which varies based on building vintage. Projects that include a laundry room or kitchen remodel, or an electrical service panel upgrade, must also install electric readiness measures. |
Buildings constructed on or after January 1, 2011. Owners enrolled in CARE and FERA programs. |
||||
Cudahy | EE |
New and Re-roof: Low-slope; 3 Year Aged- Solar Reflectance > 0.65, Thermal Emittance > 0.85, SRI > 78 Steep-slope; 3 Year Aged- Solar Reflectance > 0.23, Thermal Emittance > 0.85, SRI > 20 |
High-rise Residential/ Hotel and Motel - New and Re-roof: Low-slope; 3 Year Aged- Solar Reflectance > 0.65, Thermal Emittance > 0.75, SRI > 78 Steep-slope; 3 Year Aged- Solar Reflectance > 0.23, Thermal Emittance > 0.75, SRI > 20 |
New and Re-roof: Low-slope; 3 Year Aged- Solar Reflectance > 0.68, Thermal Emittance > 0.85, SRI > 82 Steep-slope; 3 Year Aged- Solar Reflectance > 0.23, Thermal Emittance > 0.85, SRI > 27 |
Roof repair, PV installation, vegetated roofs (25 lbs/square foot), additions resulting in less than 500 sq. ft. of added roof area or less than 50% of total roof area |
||
East Palo Alto | EE |
The proposed building design for newly constructed buildings must have a source energy (EDR 1) compliance margin of at least 9 points. Expanded electric-readiness requirements for all mixed-fuel buildings. A newly constructed building with less than 1,500 square feet of floor area shall achieve a source energy compliance margin of at least 4 points. |
The proposed building design for newly constructed buildings must have a source energy (EDR 1) compliance margin of at least 10 percent for low-rise multifamily buildings; and 4 percent for high-rise multifamily buildings. Expanded electric-readiness requirements for all mixed-fuel buildings. |
The proposed building design for newly constructed buildings must have a source energy (EDR 1) compliance margin of at least 7 percent for all nonresidential occupancies. Expanded electric-readiness requirements for commercial kitchens. The compliance margin is not required for nonresidential occupancies that are designed with single zone space-conditioning systems. |
|||
El Monte | EE |
New and Re-roof: Low-slope; 3 Year Aged- Solar Reflectance > 0.65, Thermal Emittance > 0.85, SRI > 78 |
High-rise Residential/ Hotel and Motel - New and Re-roof: Low-slope; 3 Year Aged- Solar Reflectance > 0.65, Thermal Emittance > 0.75, SRI > 78 Steep-slope; 3 Year Aged- Solar Reflectance > 0.23, Thermal Emittance > 0.75, SRI > 20 |
New and Re-roof: Low-slope; 3 Year Aged- Solar Reflectance > 0.68, Thermal Emittance > 0.85, SRI > 82 Steep-slope; 3 Year Aged- Solar Reflectance > 0.23, Thermal Emittance > 0.85, SRI > 27 |
Roof repair, PV installation, vegetated roofs (25 lbs/square foot), additions resulting in less than 500 sq. ft. of added roof area or less than 50% of total roof area |
||
Encinitas | PV |
|
High-rise Residential Additions: when total roof area is increased by 1000 sq. ft.; buildings over 10k sq. ft. shall install a minimum PV system sized at 15 kW per 10k sq. ft. of gross floor area / buildings under 10k sq. ft. shall install a minimum 5 kW PV system. High-rise Residential Alterations: permit value of at least $1,000,000 that affects 75% of gross floor area; buildings over 10k sq. ft. shall install a minimum PV system sized at 15 kW per 10k sq. ft. of gross floor area / buildings under 10k sq. ft. shall install a minimum 5 kW PV system. |
Additions: when total roof area is increased by 1000 sq. ft.; buildings over 10k sq. ft. shall install a minimum PV system sized at 15 kW per 10k sq. ft. of gross floor area / buildings under 10k sq. ft. shall install a minimum 5 kW PV system. Alterations: permit value of at least $1,000,000 that affects 75% of gross floor area; buildings over 10k sq. ft. shall install a minimum PV system sized at 15 kW per 10k sq. ft. of gross floor area / buildings under 10k sq. ft. shall install a minimum 5 kW PV system. |
|
||
EE |
Additions/ Alterations: permit valuation of greater than $50,000 shall include any one measure from Table 150.2-E. (LED lighting, water heating package, cool roof, attic insulation, duct sealing, new ducting, windows, wall insulation, HPWH, heat pump HVAC, heat pump clothes dryer, induction cooktop, PV+Electric-Ready prewire)
|
Additions/ Alterations: permit valuation of greater than $50,000 shall include any one measure from Table 180.5-B. (LED lighting, water heating package, cool roof, attic insulation, duct sealing, new ducting, windows, wall insulation, HPWH, heat pump HVAC, heat pump clothes dryer, induction cooktop, PV+Electric-Ready prewire) |
Residential buildings that receive a rating of 7 or higher on DOE Home Energy Score. |
||||
EE |
The proposed building design for newly constructed buildings must have a source energy (EDR 1) compliance margin of at least 4.5 points. Expanded electric-readiness requirements for all mixed-fuel buildings. If the Certificate of Compliance is prepared and signed by a Certified Energy Analyst, the compliance margin may be reduced by one point. |
The proposed building design for newly constructed low-rise multifamily buildings must have a source energy (EDR 1) compliance margin of at least 8 percent. Expanded electric-readiness requirements for all mixed-fuel buildings. If the Certificate of Compliance is prepared and signed by a Certified Energy Analyst, the compliance margin may be reduced by one point. |
Expanded electric-readiness requirements for all mixed-fuel nonresidential buildings. |
Single-family buildings less than 1,500 square feet (including detached accessory dwelling units), high-rise (4 stories or more) multifamily buildings, |
|||
Fairfax | EE |
Additions/Alterations: Kitchen/laundry remodels and electrical panel upgrades shall include electric readiness measures. Projects over 200 sq. ft. in pre-2010 buildings shall install a set of efficiency measures to achieve a target score. |
Newly constructed ADU's/JADU's |
||||
Los Angeles County | EE |
New and Re-roof: Low-slope; 3 Year Aged- Solar Reflectance > 0.65, Thermal Emittance > 0.85, SRI > 78 Steep-slope; 3 Year Aged- Solar Reflectance > 0.23, Thermal Emittance > 0.85, SRI > 20 |
High-rise Residential/ Hotel and Motel - New and Re-roof: Low-slope; 3 Year Aged- Solar Reflectance > 0.65, Thermal Emittance > 0.75, SRI > 78 Steep-slope; 3 Year Aged- Solar Reflectance > 0.23, Thermal Emittance > 0.75, SRI > 20 |
New and Re-roof: Low-slope; 3 Year Aged- Solar Reflectance > 0.68, Thermal Emittance > 0.85, SRI > 82 Steep-slope; 3 Year Aged- Solar Reflectance > 0.23, Thermal Emittance > 0.85, SRI > 27 |
Roof repair, PV installation, vegetated roofs (25 lbs/square foot), additions resulting in less than 500 sq. ft. of added roof area or less than 50% of total roof area |
||
Marin County | EE |
Additions/Alterations: A project greater than 750 square feet must meet CALGreen Tier 1 measures AND achieve a target score with energy efficiency and electrification measures. All newly constructed buildings must include CALGreen Tier 1 measures. |
Additions/Alterations: A project greater than 750 square feet must include CALGreen Tier 1 measures. All newly constructed buildings must include CALGreen Tier 1 measures. |
Additions/Alterations: The project must include CALGreen Tier 1 measures. All newly constructed buildings must include CALGreen Tier 1 measures. |
|||
Millbrae | PV |
|
A solar photovoltaic ( PV) system equivalent in size to 50 percent of the roof area, excluding any skylight area, shall be installed on the roof or overhang of the building or on the roof or overhang of another structure located within 250 feet of the building or on covered parking installed with the building project. |
Exceptions for over-generation/sizing. |
|||
Mountain View | PV |
|
PV installation of roof area to accommodate an all-electric building to 100% of roof area; annual kilowatt hour (kWh) consumption offset (load calculations to be provided with construction permit submittal). |
PV installation of roof area to accommodate an all-electric building to 100% of roof area; annual kilowatt hour (kWh) consumption offset (load calculations to be provided with construction permit submittal). |
|
||
Napa County | EE |
The proposed building design for newly constructed buildings must have a source energy (EDR 1) compliance margin of at least 13 points. Expanded electric-readiness requirements for all mixed-fuel buildings. If the Certificate of Compliance is prepared and signed by a Certified Energy Analyst, the compliance margin may be reduced by one point. |
The proposed building design for newly constructed buildings must have a source energy (EDR 1) compliance margin of at least 10 percent for low-rise multifamily buildings. Expanded electric-readiness requirements for all mixed-fuel buildings using gas water heaters that do not serve individual dwelling units. If the Certificate of Compliance is prepared and signed by a Certified Energy Analyst, the compliance margin may be reduced by one point. |
Newly constructed detached ADU's |
|||
Palo Alto | EE |
All newly constructed buildings must include CALGreen Tier 2 measures. Additions/Alterations: greater than 1000 square feet must include CALGreen Tier 1 measures. |
Additions/Alterations: greater than 1000 square feet must include CALGreen Tier 1 measures. |
All newly constructed buildings must include CALGreen Tier 2 measures. Additions/Alterations: must include CALGreen Tier1 and Tier 2 measures. |
|||
EE |
The proposed building design for newly constructed buildings and substantial remodels must have a source energy (EDR 1) compliance margin of at least 8 points. Expanded electric-readiness requirements for all mixed-fuel buildings. Prewire for future heat pump space heating. |
The proposed building design for newly constructed buildings and substantial remodels must have a source energy (EDR 1) compliance margin of at least 9 percent for low-rise multifamily buildings; and 1 percent for high-rise multifamily buildings. Expanded electric-readiness requirements for all mixed-fuel buildings. |
The proposed building design for newly constructed buildings and substantial remodels must have a source energy (EDR 1) compliance margin of at least 10% for office buildings; 7% for hotel/motels; 12% for restaurants; and 9% for all other nonresidential occupancies. Expanded electric-readiness requirements for all mixed-fuel buildings. The compliance margin is not required for nonresidential occupancies that are designed with single zone space-conditioning systems. |
||||
Piedmont | PV |
Additions: an entirely new upper level or that increase the building’s total roof area by thirty percent (30%) or more shall meet the photovoltaic requirements of Section 150.1(c)14 |
|
|
|
||
EE |
Additions/Alterations: a stated project value of greater than $30,000 is required to include one energy efficiency measure (attic insulation, wall insulation, hot water piping insulation, raised floor insulation, LED lighting, replacement of gas appliance with electric appliance). A stated project value of greater than $115,000 is required to include two energy efficiency measures.
|
|
|
A Home Energy Score Report for the single family building, completed within 5 years, demonstrating that the building already has a minimum Home Energy Score of 7
|
|||
Rolling Hills | EE |
New and Re-roof: Low-slope; 3 Year Aged- Solar Reflectance > 0.65, Thermal Emittance > 0.85, SRI > 78 Steep-slope; 3 Year Aged- Solar Reflectance > 0.23, Thermal Emittance > 0.85, SRI > 20 |
High-rise Residential/ Hotel and Motel - New and Re-roof: Low-slope; 3 Year Aged- Solar Reflectance > 0.65, Thermal Emittance > 0.75, SRI > 78 Steep-slope; 3 Year Aged- Solar Reflectance > 0.23, Thermal Emittance > 0.75, SRI > 20 |
New and Re-roof: Low-slope; 3 Year Aged- Solar Reflectance > 0.68, Thermal Emittance > 0.85, SRI > 82 Steep-slope; 3 Year Aged- Solar Reflectance > 0.23, Thermal Emittance > 0.85, SRI > 27 |
Roof repair, PV installation, vegetated roofs (25 lbs/square foot), additions resulting in less than 500 sq. ft. of added roof area or less than 50% of total roof area |
||
San Anselmo | EE |
Additions/Alterations: Kitchen/laundry remodels and electrical panel upgrades shall include electric readiness measures AND projects over 750 sq. ft. in pre-2010 buildings shall install a set of efficiency measures to achieve a target score. |
Newly constructed ADU's/JADU's |
||||
San Jose | EE |
The proposed building design for newly constructed buildings must have a source energy (EDR 1) compliance margin of at least 8 points. |
The proposed building design for newly constructed buildings (including hotels/motels) must have a source energy (EDR 1) compliance margin of at least 6%. Electrification requirements for gas fuel systems to allow for future installation of a central heat pump water heater. |
The proposed building design for newly constructed office buildings must have a source energy (EDR 1) compliance margin of at least 10%; all other nonresidential occupancies must have compliance margin of at least 6%. |
Industrial and manufacturing building occupancies. |
||
San Luis Obispo | EE |
The proposed building design for newly constructed buildings must have a source energy (EDR 1) compliance margin of at least 6 points. |
The proposed building design for newly constructed buildings must have a source energy (EDR 1) compliance margin of at least 9 percent for low-rise multifamily buildings; and 3 percent for high-rise multifamily buildings. |
The proposed building design for newly constructed buildings must have a source energy (EDR 1) compliance margin of at least 7 percent for all nonresidential occupancies. The compliance margin is not required for nonresidential occupancies that are designed with single zone space-conditioning systems. |
|||
EE |
After January 1, 2025 any major addition or alteration shall install a set of energy efficiency measures to achieve a target score from a weighted menu of measures. Projects that include a new electrical panel and service upgrade to 200A shall include electric readiness components. |
The project is the result of a repair OR if compliance costs exceed 10% of total project valuation. See ordinance text for full exception language. |
|||||
San Rafael | EE |
Additions/Alterations: Projects of a building originally permitted for construction before 2011 that affects a floor area greater than 500 square feet of existing floor area and/or new floor shall install a set of measures to achieve a target score from a weighted menu of measures; which is based on building vintage. |
Mobile/Manufactured homes. Covenant or other deed restricted properties. Low-income utility customers have an alternative compliance pathway. See ordinance text for full exception language. |
||||
Santa Clara | PV |
|
Hotel/motel occupancies and high-rise multifamily buildings with ten habitable stories or fewer, shall install a minimum PV system sized at 3 kW for buildings less than 10k sq. ft. ; or a PV system sized at 5kW for buildings greater than 10k sq. ft. |
Nonresidential buildings with three habitable stories or fewer, other than I-2 and I-2.1 buildings shall install a minimum PV system sized at 3 kW for buildings less than 10k sq. ft. ; or a PV system sized at 5kW for buildings greater than 10k sq. ft.
|
As an alternative to a solar PV system, the building type may provide a solar hot water system (solar thermal) with a minimum collector area of 40 square feet. |
||
Santa Cruz | EE |
The proposed building design for newly constructed buildings must have a source energy (EDR 1) compliance margin of at least 9 points. |
The proposed building design for newly constructed buildings must have a source energy (EDR 1) compliance margin of at least 10 percent for low-rise multifamily buildings; and 4 percent for high-rise multifamily buildings. |
The proposed building design for newly constructed buildings must have a source energy (EDR 1) compliance margin of at least 7 percent for all nonresidential occupancies. |
|||
Santa Monica | EE |
The proposed building design for newly constructed buildings must have a source energy (EDR 1) compliance margin of at least 5 points. Pre-wire for future heat pump space heating. A newly constructed building with less than 1,500 square feet of floor area shall achieve a source energy compliance margin of at least 2 points. |
The proposed building design for newly constructed buildings of 3 stories or less must have a source energy (EDR 1) compliance margin of at least 7%. Newly constructed buildings of 4 stories or more must have a source energy (EDR 1) compliance margin of at least 3%. Expanded electric-readiness requirements for all mixed-fuel buildings. |
The proposed building design for newly constructed buildings must have a source energy (EDR 1) compliance margin of at least 14% for office buildings; 7% for hotel/motels; 2% for small restaurants; and 7% for all other nonresidential occupancies. Expanded electric-readiness requirements for all mixed-fuel buildings. The compliance margin is not required for nonresidential occupancies that are designed with single zone space-conditioning systems. |
|||
Solana Beach | PV |
All newly constructed High-Rise Residential buildings shall be required to install an onsite photovoltaic system. Additions/Alterations: remodels of more than 50% of exterior wall OR 50% of interior walls (structure > than 1200 sq. ft.) OR 50% of roof area OR 50% of floor area OR the addition of 700+ sq. ft. of floor area. |
All newly constructed Nonresidential buildings shall be required to install an onsite photovoltaic system. Additions/Alterations: remodels of more than 50% of exterior wall OR 50% of interior walls (structure > than 1200 sq. ft.) OR 50% of roof area OR 50% of floor area OR the addition of 50% or more floor area OR a permit valuation of more than $400k. |
See ordinance for PV system exceptions. |
|||
West Hollywood | EE |
New and Re-roof: Low-slope; 3 Year Aged- Solar Reflectance > 0.65, Thermal Emittance > 0.85, SRI > 78 Steep-slope; 3 Year Aged- Solar Reflectance > 0.23, Thermal Emittance > 0.85, SRI > 20 |
High-rise Residential/ Hotel and Motel - New and Re-roof: Low-slope; 3 Year Aged- Solar Reflectance > 0.65, Thermal Emittance > 0.75, SRI > 78 Steep-slope; 3 Year Aged- Solar Reflectance > 0.23, Thermal Emittance > 0.75, SRI > 20 |
New and Re-roof: Low-slope; 3 Year Aged- Solar Reflectance > 0.68, Thermal Emittance > 0.85, SRI > 82 Steep-slope; 3 Year Aged- Solar Reflectance > 0.23, Thermal Emittance > 0.85, SRI > 27 |
Roof repair, PV installation, vegetated roofs (25 lbs/square foot), additions resulting in less than 500 sq. ft. of added roof area or less than 50% of total roof area |
||
This report was prepared for the California Statewide Codes & Standards Program. The program is funded by California utility customers and administered by Pacific Gas and Electric Company, San Diego Gas & Electric Company (SDG&E®), and Southern California Edison Company under the auspices of the California Public Utilities Commission and in support of the California Energy Commission. © 2024 Pacific Gas and Electric Company, San Diego Gas and Electric Company, and Southern California Edison. |
Jurisdiction | Ord. Type | Adopted Date | Single Family | Multifamily | Nonresidential | Exceptions | Ordinance |
---|---|---|---|---|---|---|---|
Agoura Hills |
All-Electric (CALGreen Amendment) |
All new buildings will be constructed as all-electric buildings. |
All new buildings will be constructed as all-electric buildings. |
All new buildings will be constructed as all-electric buildings. |
Residential: Attached ADU's, swimming pools/spas, reconstructed buildings lost in a disaster. Nonresidential: Back-up power for Critical Facilities necessary to protect public |
||
Alameda |
All-Electric (CALGreen Amendment) |
All new buildings will be constructed as all-electric buildings. Additions/Alterations: replacement or addition of greater than 50% of foundation for other than repair OR where greater than 50% of floor area is remodeled (including unfinished spaces.) |
All new buildings will be constructed as all-electric buildings. Additions/Alterations: replacement or addition of greater than 50% of foundation for other than repair OR where greater than 50% of floor area is remodeled (including unfinished spaces.) |
All new buildings will be constructed as all-electric buildings. Additions/Alterations:replacement or addition of greater than 50% of foundation for other than repair OR where greater than 50% of floor area is remodeled (including unfinished spaces.) |
Nonresidential: Non-electric space heating for F, H, and L occupancies may apply for an exemption. Commercial food heat-processing equipment. Granted exceptions must pre-wire for future electric appliances. |
||
Albany |
All-Electric (CALGreen Amendment) |
All new buildings will be constructed as all-electric buildings. Major alterations requiring an automatic fire sprinkler system as per Albany Municipal Code shall be all electric buildings. Additional prescriptive requirements. |
All new buildings will be constructed as all-electric buildings. Major alterations requiring an automatic fire sprinkler system as per Albany Municipal Code shall be all electric buildings. Additional prescriptive requirements. |
All new buildings will be constructed as all-electric buildings. Major alterations requiring an automatic fire sprinkler system as per Albany Municipal Code shall be all electric buildings. Additional prescriptive requirements. |
Laboratory buildings. |
||
Atherton |
All-Electric (CALGreen Amendment) |
All new buildings, ADU's, guest/pool houses will be constructed with electric space and water heating. |
All new buildings will be constructed with electric space and water heating. |
All new buildings will be constructed as all-electric buildings. |
Residential: cooking equipment, fireplaces, clothes drying appliances Nonresidential: commercial cooking equipment |
||
Berkeley
This ordinance has been repealed.
Staff Report
|
All-Electric (Municipal Code Amendment) |
All new buildings will be constructed as all-electric buildings. |
All new buildings will be constructed as all-electric buildings. |
All new buildings will be constructed as all-electric buildings. |
|||
Brisbane
This ordinance has been repealed.
Staff Report
|
All-Electric (CALGreen Amendment) |
All new buildings will be constructed as all-electric buildings. |
All new buildings will be constructed as all-electric buildings. |
All new buildings will be constructed as all-electric buildings. |
Nonresidential: Laboratory areas may contain non-electric space conditioning equipment. |
||
Burlingame |
All-Electric (CALGreen Amendment) |
All new buildings will be constructed as all-electric buildings. Additions/ Alterations: Greater than 50% foundation or above sill replacement shall be considered new construction.
|
All new buildings will be constructed as all-electric buildings. Additions/ Alterations: Greater than 50% foundation or framing above sill replacement shall be considered new construction. |
All new buildings will be constructed as all-electric buildings. Additions/ Alterations: Greater than 50% foundation or framing above sill replacement shall be considered new construction. |
Nonresidential: buildings containing kitchens located in a place of public accommodation may apply for an exemption for commercial food heat-processing equipment served by fuel gas. Granted exceptions must pre-wire for future electric appliances. |
||
Campbell
This ordinance has been repealed.
Staff Report
|
All-Electric (CALGreen Amendment) |
All new buildings will be constructed as all-electric buildings. |
All new buildings will be constructed as all-electric buildings. |
All new buildings will be constructed as all-electric buildings. |
Nonresidential: Emergency services, commercial cooking, specific case-use restaurants, industrial processes may be granted an exemption for gas use. Granted exceptions must pre-wire for future electric appliances. |
||
Contra Costa County |
All-Electric (Energy Code Amendment) |
All new buildings will be constructed as all-electric buildings. |
All new buildings will be constructed as all-electric buildings. |
All new buildings will be constructed as all-electric buildings. |
Nonresidential: Buildings with public kitchens or specialized industry. |
||
Corte Madera
This ordinance has been repealed.
Staff Report
|
All-Electric (CALGreen Amendment) |
All new buildings will be constructed as all-electric buildings. |
All new buildings will be constructed as all-electric buildings. |
All new buildings will be constructed as all-electric buildings. |
Residential: Emergency generators for Essential Services and multifamily buildings, ADU's/JADU's. Nonresidential: Food service establishments and equipment for industrial process heat. |
||
Cupertino |
All-Electric (CALGreen Amendment) |
All new buildings will be constructed as all-electric buildings. |
All new buildings will be constructed as all-electric buildings. |
All new buildings will be constructed as all-electric buildings. |
Nonresidential: F, H, and L Occupancies, or other similar research & development, Essential Services. Buildings with for-profit restaurants may apply for an exemption. Hotels/motels with greater than 80 rooms may utilize fuel gas for on-site commercial clothes drying equipment. Granted exceptions must pre-wire for future electric appliances. |
||
Daly City |
All-Electric (CALGreen Amendment) |
All new buildings will be constructed as all-electric buildings. Additions/ Alterations: replacement or addition of greater than 50% of foundation for other than repair OR more than 50% of framing above sill is replaced for other than repair |
All new buildings will be constructed as all-electric buildings. Additions/ Alterations: replacement or addition of greater than 50% of foundation for other than repair OR more than 50% of framing above sill is replaced for other than repair. |
All new buildings will be constructed as all-electric buildings. Additions/ Alterations: replacement or addition of greater than 50% of foundation for other than repair OR more than 50% of framing above sill is replaced for other than repair. |
Residential: ADU's/JADU's, Hotels/motels with greater than 80 rooms may utilize fuel gas for on-site commercial clothes drying equipment. Nonresidential: Buildings containing kitchens. F, H, L occupancies and Scientific Laboratories are exempt |
||
Dublin |
All-Electric (CALGreen Amendment) |
All new buildings will be constructed as all-electric buildings. Additions/Alterations: alterations of more than 50% of the existing exterior walls and additions that increase the square footage of the structure by more than 50%.
|
All new buildings will be constructed as all-electric buildings. Additions/Alterations: alterations of more than 50% of the existing exterior walls and additions that increase the square footage of the structure by more than 50%. |
All new buildings will be constructed as all-electric buildings. Additions/Alterations: alterations of more than 50% of the existing exterior walls and additions that increase the square footage of the structure by more than 50%. |
Nonresidential: Buildings with kitchens in places of public accomodation may apply for an exemption. Granted exceptions must pre-wire for future electric appliance.
|
||
East Palo Alto
This ordinance has been repealed.
Staff Report
|
All-Electric (CALGreen Amendment) |
All new buildings will be constructed as all-electric buildings. Additions/ Alterations: replacement or addition of greater than 50% of foundation for other than repair OR more than 50% of framing above sill is replaced for other than repair. |
All new buildings will be constructed as all-electric buildings. Additions/ Alterations: replacement or addition of greater than 50% of foundation for other than repair OR more than 50% of framing above sill is replaced for other than repair. |
All new buildings will be constructed as all-electric buildings. Additions/ Alterations: replacement or addition of greater than 50% of foundation for other than repair OR more than 50% of framing above sill is replaced for other than repair. |
Residential: central water heating for Affordable Housing rental units. Nonresidential: Public emergency centers. Buildings with kitchens in places of public accommodation may apply for an exemption to install commercial food heat-processing equipment. |
||
Encinitas
This ordinance has been repealed.
Staff Report
|
All-Electric (CALGreen Amendment) |
All new buildings will be constructed as all-electric buildings. |
All new buildings will be constructed as all-electric buildings. |
All new buildings will be constructed as all-electric buildings. |
Nonresidential: Essential buildings. Buildings with for-profit restaurants may apply for an exemption. Granted exceptions must pre-wire for future electric appliance. |
||
Fairfax |
All-Electric (Municipal Code Amendment) |
All new buildings will be constructed as all-electric buildings. |
All new buildings will be constructed as all-electric buildings. |
All new buildings will be constructed as all-electric buildings. |
For-profit kitchens and public interest projects. |
||
Glendale |
All-Electric (CALGreen Amendment) |
All newly constructed buildings shall be all-electric buildings. |
All newly constructed buildings shall be all-electric buildings. |
All newly constructed buildings shall be all-electric buildings. Commercial kitchens may request an infeasibility waiver. |
|
||
Half Moon Bay |
All-Electric (Municipal Code Amendment) |
All new buildings will be constructed as all-electric buildings. Prohibition on conversion to Mixed-Fuel buildings. Termination of gas service in 2045. |
All new buildings will be constructed as all-electric buildings. Prohibition on conversion to Mixed-Fuel buildings. Termination of gas service in 2045. |
All new buildings will be constructed as all-electric buildings. Prohibition on conversion to Mixed-Fuel buildings. Termination of gas service in 2045. |
Commercial greenhouses |
||
Hayward |
All-Electric (CALGreen Amendment) |
Fuel Gas Infrastructure shall be prohibited in newly constructed residential buildings. Including ADU's. |
Fuel Gas Infrastructure shall be prohibited in newly constructed residential buildings. |
New nonresidential building shall be required to have sufficient electrical capacity, including reserved circuit breakers, electrical conduit, subpanels, panels, switchboards, and transformers, to facilitate future full building electrification. |
|
||
Healdsburg |
All-Electric (CALGreen Amendment) |
All new buildings will be constructed as all-electric buildings. |
All new buildings will be constructed as all-electric buildings. |
All new buildings will be constructed as all-electric buildings. |
Newly constructed buildings may contain natural gas cooking appliances and fireplaces. Attached ADUs and Essential Facilities are exempt. Granted exceptions must pre-wire for future electric appliances. |
||
Hercules
This ordinance has been repealed.
Staff Report
|
All-Electric (Municipal Code Amendment) |
All new buildings will be constructed as all-electric buildings. Includes detached ADUs. Alterations/Additions: 50% or more of the exterior walls or involving work that exceeds 50% of the appraised value of the structure. |
All new buildings will be constructed as all-electric buildings. Alterations/Additions: 50% or more of the exterior walls or involving work that exceeds 50% of the appraised value of the structure. |
All new hotels/motels will be constructed as all-electric buildings. Alterations/Additions: 50% or more of the exterior walls or involving work that exceeds 50% of the appraised value of the structure. |
Laboratories and Emergency facilities. |
||
Livermore |
All-Electric (CALGreen Amendment) |
All new buildings will be constructed as all-electric buildings. |
All new buildings will be constructed as all-electric buildings. |
All new buildings will be constructed as all-electric buildings. |
Residential: ADU's Nonresidential: Laboratories and buildings containing kitchens located in a place of public accommodation may apply for an exemption for commercial food heat-processing equipment served by fuel gas. Hotels/motels with greater than 80 rooms may utilize fuel gas for on-site commercial clothes drying equipment. Granted exceptions must pre-wire for future electric appliances. |
||
Los Altos |
All-Electric (Energy Code Amendment) |
All new buildings will be constructed as all-electric building. |
All new buildings will be constructed as all-electric building. |
All new buildings will be constructed as all-electric building. |
Residential: Single family dwellings, detached ADUs, multifamily dwellings with two to nine units may install gas cooking appliances and fireplaces. Nonresidential: Buildings containing a for-profit restaurant may install gas cooking appliances. Laboratories and Public buildings may apply for an exemption. Granted exemptions must pre-wire for future electric appliances. |
||
Los Altos Hills
This ordinance has been repealed.
Staff Report
|
All-Electric (CALGreen Amendment) |
All new buildings will be constructed as all-electric buildings. Includes detached ADUs. |
All new buildings will be constructed as all-electric buildings. |
Residential: Indoor and outdoor cooking, fireplaces, and pool/spa heating are exempt. |
|||
Los Angeles |
All-Electric (Municipal Code Amendment) |
All new buildings will be constructed as all-electric buildings. |
All new buildings will be constructed as all-electric buildings. |
All new buildings will be constructed as all-electric buildings. |
Residential: Attached accessory dwelling units using existing gas piping systems in conjunction with the primary dwelling. Nonresidential: F and L occupancies. Cooking equipment contained within kitchens located in a public use area, such as restaurants, commissaries, cafeterias, and community kitchens. Granted exceptions must pre-wire for future electric appliances. |
||
Los Gatos |
All-Electric (CALGreen Amendment) |
All new buildings will be constructed as all-electric building. Alterations/Additions: 50% or more of the foundation or existing framing. Tenant improvements shall not be considered new construction. |
All new buildings will be constructed as all-electric building. Alterations/Additions: 50% or more of the foundation or existing framing. Tenant improvements shall not be considered new construction.
|
All new buildings will be constructed as all-electric building. Alterations/Additions: 50% or more of the foundation or existing framing. Tenant improvements shall not be considered new construction.
|
Nonresidential: buildings containing kitchens located in a place of public accommodation may apply for an exemption for commercial food heat-processing equipment served by fuel gas. |
||
Marin County |
All-Electric (Municipal Code Amendment) |
All new buildings will be constructed as all-electric building. |
All new buildings will be constructed as all-electric building. |
All new buildings will be constructed as all-electric building. |
Emergency electrical generation backup equipment for essential services and multifamily buildings. Natural gas infrastructure for food service establishments and equipment requiring industrial process heat. Attached ADU's and JADU's. Granted exceptions must pre-wire for future electric appliances. |
||
Martinez |
All-Electric (Municipal Code Amendment) |
All new residential buildings will be constructed as all-electric buildings. Includes detached ADUs. |
All new residential buildings will be constructed as all-electric buildings. |
All new hotel, retail, and office buildings will be constructed as all-electric buildings. |
|||
Menlo Park |
All-Electric (Energy Code Amendment) |
All new buildings will be constructed as all-electric buildings. Prohibition on conversion to Mixed-Fuel buildings.
|
All new buildings will be constructed as all-electric buildings. Prohibition on conversion to Mixed-Fuel buildings. |
All new buildings will be constructed as all-electric buildings. Prohibition on conversion to Mixed-Fuel buildings.
|
Residential: all buildings that are 3 stories or less may contain non-electric cooking appliances and fireplaces. Nonresidential: Scientific laboratory buildings, emergency centers. For-profit kitchens may apply for an exemption for gas use. Granted exceptions must pre-wire for future electric appliances. |
||
Millbrae |
All-Electric (Energy Code Amendment) |
All new buildings will be constructed as all-electric buildings. |
All new buildings will be constructed as all-electric buildings. |
All new buildings will be constructed as all-electric buildings. |
Residential: all low-density buildings and ADU's may contain non-electric cooking appliances and fireplaces. Nonresidential: Scientific laboratory buildings, emergency centers, and for-profit restaurants may install gas-fueled cooking appliances. Exceptions must pre-wire for future electric appliances. |
||
Milpitas |
All-Electric (CALGreen Amendment) |
All new buildings will be constructed as all-electric buildings. Additions/ Alterations: Greater than 50% foundation or above sill replacement shall be considered new construction. |
All new buildings will be constructed as all-electric buildings. Additions/ Alterations: Greater than 50% foundation or above sill replacement shall be considered new construction. |
All new buildings will be constructed as all-electric buildings. Additions/ Alterations: Greater than 50% foundation or above sill replacement shall be considered new construction. |
|
||
Morgan Hill |
All-Electric (Municipal Code Amendment) |
All new buildings will be constructed as all-electric buildings.
|
All new buildings will be constructed as all-electric buildings. |
All new buildings will be constructed as all-electric buildings. |
|||
Mountain View |
All-Electric (CALGreen Amendment) |
All new buildings will be constructed as all-electric buildings. |
All new buildings will be constructed as all-electric buildings. |
All new buildings will be constructed as all-electric buildings. |
Nonresidential: F, H, and L Occupancies |
||
Oakland |
All-Electric (Municipal Code Amendment) |
All new buildings will be constructed as all-electric buildings. |
All new buildings will be constructed as all-electric buildings. |
All new buildings will be constructed as all-electric buildings. |
Attached ADUs |
||
Ojai |
All-Electric (Municipal Code Amendment) |
All covered projects shall be built with no natural gas infrastructure, appliances, or equipment. |
All covered projects shall be built with no natural gas infrastructure, appliances, or equipment. |
All covered projects shall be built with no natural gas infrastructure, appliances, or equipment. |
|||
Pacifica |
All-Electric (CALGreen Amendment) |
All new buildings will be constructed as all-electric building. |
All new buildings will be constructed as all-electric building. |
All new buildings will be constructed as all-electric building. |
Nonresidential: Buildings with for-profit restaurants may apply for an exemption for gas-fueled cooking appliances. Granted exceptions must pre-wire for future electric appliance.
|
||
Palo Alto
This ordinance has been repealed.
Staff Report
|
All-Electric (CALGreen Amendment) |
All new buildings (including detached ADU’s) will be constructed as all-electric buildings. Additions/Alterations: for the replacement of an existing gas water heater or installation of an additional water heater; the new water heater shall be a heat pump water heater. |
All new buildings will be constructed as all-electric buildings. |
All new buildings will be constructed as all-electric buildings. |
|||
Pasadena |
All-Electric (Municipal Code Amendment) |
N/A |
Newly constructed multifamily buildings greater than 3 units shall be All-Electric buildings. |
Newly constructed commercial and mixed-use buildings shall be All-Electric buildings. Additions/Alterations of existing commercial buildings exceeding 50% or more of the existing square foot area must electrify the entire building. |
Newly constructed ADU's, commercial kitchens/food service establishments, Essential buildings, medical healthcare facilities, research and development laboratories. |
||
Petaluma |
All-Electric (Municipal Code Amendment) |
All new buildings will be constructed as all-electric building. |
All new buildings will be constructed as all-electric building. |
All new buildings will be constructed as all-electric building. |
Essential Services buildings that are electric-ready and backup power facilities for such buildings. |
||
Piedmont |
All-Electric (Energy Code Amendment) |
All new buildings and ADU's will be constructed as all-electric buildings. |
|
|
|
||
Pleasanton |
All-Electric (CALGreen Amendment) |
All new buildings will be constructed as all-electric buildings. Additions/ Alterations: Greater than 50% foundation or above sill replacement shall be considered new construction. |
All new buildings will be constructed as all-electric buildings. Additions/ Alterations: Greater than 50% foundation or above sill replacement shall be considered new construction. |
All new buildings will be constructed as all-electric buildings. Additions/ Alterations: Greater than 50% foundation or above sill replacement shall be considered new construction. |
Nonresidential: Buildings with public kitchens requiring commercial food heat-processing equipment; or buildings requiring industrial process heat may apply for an exemption. |
||
Portola Valley |
All-Electric (CALGreen Amendment) |
All new buildings will be constructed as all-electric buildings. Alterations/Additions: Newly constructed = 50% or more of existing floor area OR wall area, or combination of percentages of floor and wall area. Upgrade/relocation of existing air conditioning unit shall be replaced with a heat pump. Replacement of main electrical panel shall upgrade to capacity for full electrification.
|
All new buildings will be constructed as all-electric buildings. Alterations/Additions: 50% or more of existing floor area OR wall area, or combination of percentages of floor and wall area. |
All new buildings will be constructed as all-electric buildings. Alterations/Additions: 50% or more of existing floor area OR wall area, or combination of percentages of floor and wall area. |
Emergency Services buildings |
||
Redwood City |
All-Electric (CALGreen Amendment) |
All new buildings will be constructed as all-electric buildings. |
All new buildings will be constructed as all-electric buildings. |
All new buildings will be constructed as all-electric buildings. |
|
||
Richmond |
All-Electric (Municipal Code Amendment) |
Natural gas infrastructure is prohibited in newly constructed buildings. |
Natural gas infrastructure is prohibited in newly constructed buildings. |
Natural gas infrastructure is prohibited in newly constructed buildings. |
Buildings determined to be in the public interest. Granted exceptions must pre-wire for future electric appliances. |
||
Riverside
This ordinance has been repealed.
Staff Report
|
All-Electric (Municipal Code Amendment) |
After January 1, 2023, all newly constructed buildings that are three stories or less shall be all-electric buildings. After January 1, 2026, all newly constructed buildings that are four stories or more shall be all-electric buildings. |
After January 1, 2023, all newly constructed buildings that are three stories or less shall be all-electric buildings. After January 1, 2026, all newly constructed buildings that are four stories or more shall be all-electric buildings. |
After January 1, 2023, all newly constructed buildings that are three stories or less shall be all-electric buildings. After January 1, 2026, all newly constructed buildings that are four stories or more shall be all-electric buildings. |
New ADU's/JADU's, food service establishment and commercial kitchen appliances utilized for cooking purposes, process loads for manufacturing or industrial facility equipment, essential buildings, laboratories , and medical-health care facilities. |
||
Sacramento |
All-Electric (Municipal Code Amendment) |
After January 1, 2023, all newly constructed buildings that are three stories or less shall be All-Electric buildings. After January 1, 2026, all newly constructed buildings that are four stories or more shall be All-Electric buildings. |
After January 1, 2023, all newly constructed buildings that are three stories or less shall be All-Electric buildings. After January 1, 2026, all newly constructed buildings that are four stories or more shall be All-Electric buildings. |
After January 1, 2023, all newly constructed buildings that are three stories or less shall be All-Electric buildings. After January 1, 2026, all newly constructed buildings that are four stories or more shall be All-Electric buildings. |
|||
San Anselmo |
All-Electric (Municipal Code Amendment) |
All new buildings will be constructed as all-electric buildings. |
N/A |
N/A |
|||
San Bruno |
All-Electric (Municipal Code Amendment) |
All new buildings and ADUs will be constructed with electric space, water heating, cooking, and clothes drying. |
All new buildings will be constructed with electric space, water heating, cooking, and clothes drying. |
All new buildings will be constructed with electric space, water heating, cooking, and clothes drying. |
Residential: Fan-type central furnaces, fireplaces, pool/spa heaters. Nonresidential: cooking appliances for restaurants and food services. |
||
San Carlos |
All-Electric (CALGreen Amendment) |
All new buildings will be constructed with electric space, water heating, and clothes drying. Exceptions for cooking appliances and fireplaces. Alterations/Additions: 50% or more of the foundation or existing framing |
All new buildings will be constructed as all electric buildings. Alterations/Additions: 50% or more of the foundation or existing framing |
All new buildings will be constructed with electric space and water heating. Exceptions for Laboratory areas, restaurants, for-profit kitchens. Alterations/Additions: 50% or more of the foundation or existing framing.
|
ADU's and JADU's. |
||
San Francisco |
All-Electric (Municipal Code Amendment) |
All new buildings will be constructed as all-electric building. |
All new buildings will be constructed as all-electric building. |
All new buildings will be constructed as all-electric building. |
|||
San Jose |
All-Electric (Municipal Code Amendment) |
All new buildings will be constructed as all-electric buildings. |
All new buildings will be constructed as all-electric buildings. |
All new buildings will be constructed as all-electric buildings. |
Hospitals and facilities with a Distributed Energy Resource. |
||
San Leandro |
All-Electric (CALGreen Amendment) |
All new buildings will be constructed as all-electric buildings. |
All new buildings will be constructed as all-electric buildings. |
All new buildings will be constructed as all-electric buildings. |
Residential: attached ADU's Nonresidential: Industrial buildings with F, H, or S occupancies. Buildings containing kitchens located in a place of public accommodation. Hotels and motels with eighty or more guestrooms. Granted exceptions must pre-wire for future electric appliances. |
||
San Luis Obispo
This ordinance has been repealed.
Staff Report
|
All-Electric (Municipal Code Amendment) |
All new buildings will be constructed as all-electric buildings. |
All new buildings will be constructed as all-electric buildings. |
All new buildings will be constructed as all-electric buildings. |
Natural gas infrastructure for certain end uses is allowed through December 31, 2025 when no all-electric alternative is commercially available or viable: commercial kitchens, ADU water/space heating, public swimming pools |
||
San Mateo
This ordinance has been repealed.
Staff Report
|
All-Electric (CALGreen Amendment) |
All new buildings will be constructed as all-electric buildings. Additions/Alterations: space cooling appliance upgrades in conjunction space heating upgrade, shall use electricity for space heating. Water heater appliance upgrades shall be all-electric. Kitchen and laundry area alterations shall pre-wire for future electric appliances. Panel upgrades shall reserve capacity for future electric appliances. |
All new buildings will be constructed as all-electric buildings. |
All new buildings will be constructed as all-electric buildings. |
Nonresidential: Laboratories or buildings with public kitchens requiring commercial food heat-processing equipment may apply for an exemption. |
||
San Pablo |
All-Electric (Energy Code Amendment) |
All new buildings will be constructed as all-electric buildings. |
All new buildings will be constructed as all-electric buildings. |
All new buildings will be constructed as all-electric buildings. |
Emergency services, commercial cooking, scientific lab space-heating , residential cooking appliances, fireplaces |
||
San Rafael
This ordinance has been repealed.
Staff Report
|
All-Electric (Municipal Code Amendment) |
Fuel gas and oil piping is prohibited in new construction. Existing fuel gas/oil piping or gas meter service size may not be expanded unless overall gas use is reduced, unchanged, or is for additional attached housing. |
Fuel gas and oil piping is prohibited in new construction. |
Fuel gas and oil piping is prohibited in new construction. |
Nonresidential: fuel gas and oil piping is allowed in new construction emergency electrical generation when required by the code, commercial kitchens for preparing food, commercial laundry, or in an approved industrial process. |
||
Santa Barbara |
All-Electric (Municipal Code Amendment) |
Natural gas infrastructure is prohibited in newly constructed buildings. |
Natural gas infrastructure is prohibited in newly constructed buildings. |
Natural gas infrastructure is prohibited in newly constructed buildings. |
Buildings determined to be in the public interest. Granted exceptions must pre-wire for future electric appliances. |
||
Santa Clara |
All-Electric (Energy Code Amendment) |
All new buildings will be constructed as all-electric buildings. |
All new buildings will be constructed as all-electric buildings. |
All new buildings will be constructed as all-electric buildings. |
Nonresidential: F, H, and L Occupancies, or Emergency Services. Nonresidential kitchens may utilize gas cooking appliances only if there is no all-electric option. Hotels/motels with greater than 80 rooms may utilize fuel gas for on-site commercial clothes drying equipment. Granted exceptions must pre-wire for future electric appliances. |
||
Santa Cruz
This ordinance has been repealed.
Staff Report
|
All-Electric (Municipal Code Amendment) |
All new buildings will be constructed as all-electric buildings. Includes ADUs greater than 750 square feet. |
All new buildings will be constructed as all-electric buildings. |
All new buildings will be constructed as all-electric buildings. |
Industrial heat processes and for-profit kitchen cooking equipment. |
||
Santa Cruz County |
All-Electric (Energy Code Amendment) |
All new buildings will be constructed as all-electric buildings. Includes ADU's. |
All new buildings will be constructed as all-electric buildings. |
||||
Santa Monica | All-Electric |
New Pools: If heated, must be heat pump water heater or solar thermal system. |
New Pools: If heated, must be heat pump water heater or solar thermal system. |
New Pools: If heated, must be heat pump water heater or solar thermal system. |
|
||
All-Electric (Municipal Code Amendment) |
All new buildings will be constructed as all-electric building. |
All new buildings will be constructed as all-electric building. |
All new buildings will be constructed as all-electric building. |
Junior ADU's and attached ADU's. Public interest exemption for commercial restaurants/institutional cooking, medical uses, laboratory equipment. |
|||
Santa Rosa |
All-Electric (CALGreen Amendment) |
All new buildings will be constructed as all-electric building. |
Attached ADU's, reconstructed buildings lost in a disaster, or new construction where existing utility infrastructure would have to be removed at owner's expense. |
||||
Saratoga
This ordinance has been repealed.
Staff Report
|
All-Electric (CALGreen Amendment) |
All new buildings will be constructed as all-electric buildings. Alterations: 50% or more of the exterior walls and 50% of existing roof structure OR 50% of interior walls. |
All new buildings will be constructed as all-electric buildings. Alterations: 50% or more of the exterior walls and 50% of existing roof structure OR 50% of interior walls. |
All new buildings will be constructed as all-electric buildings. Alterations: 50% or more of the exterior walls and 50% of existing roof structure OR 50% of interior walls. |
Residential: buildings may use natural gas cooking appliances but must prewire for future electrical appliances. Nonresidential: buildings may use natural gas cooking appliances but must prewire for future electrical appliances. Emergency centers are exempt. |
||
Solana Beach |
All-Electric (CALGreen Amendment) |
All newly constructed residential shall use electricity as the source of energy for all space heating, water heating (including pools and spas), and clothes drying appliances and equipment AND prewire for the installation of battery storage. |
All newly constructed residential and motel/hotel buildings shall use electricity as the source of energy for all space heating, water heating (including pools and spas), and clothes drying appliances and equipment AND prewire for the installation of battery storage. |
All newly constructed nonresidential buildings shall use electricity as the source of energy for all space heating, water heating (including pools and spas), and clothes drying appliances and equipment AND prewire for the installation of battery storage. |
Cooking appliances, solar thermal systems for pool, spa heating, domestic hot water, service hot water and space heating. Buildings plumbed for natural gas/propane shall prewire for future electrical appliances. |
||
Sonoma County |
All-Electric (CALGreen Amendment) |
All new buildings, including ADU's, will be constructed as all-electric buildings. |
Natural gas or propane cooking appliances, fossil fuel generators, and attached ADU's. |
||||
South San Francisco |
All-Electric (Energy Code Amendment) |
All new buildings will be constructed as all-electric buildings. Additions/ Alterations: replacement or addition of greater than 50% of foundation for other than repair OR more than 50% of framing above sill is replaced for other than repair. |
All new buildings will be constructed as all-electric buildings. Additions/ Alterations: replacement or addition of greater than 50% of foundation for other than repair OR more than 50% of framing above sill is replaced for other than repair. |
|
Nonresidential: Newly constructed nonresidential buildings and all mixed use nonresidential occupancy buildings. |
||
Sunnyvale |
All-Electric (Municipal Code Amendment) |
All new buildings will be constructed as all-electric buildings. Additions/ Alterations: Greater than 50% of exterior walls are removed or 50% of wall plate height is raised shall be considered new construction. |
All new buildings will be constructed as all-electric buildings. Additions/ Alterations: Greater than 50% of exterior walls are removed or 50% of wall plate height is raised shall be considered new construction. |
All new buildings will be constructed as all-electric buildings. Additions/ Alterations: Greater than 50% of exterior walls are removed or 50% of wall plate height is raised shall be considered new construction. |
Nonresidential: F, H, and L Occupancies, or Emergency Services. Nonresidential kitchens may apply for an exemption. Granted exemptions must pre-wire for future electric appliances. |
||
Ventura County |
All-Electric (CALGreen Amendment) |
All new buildings will be constructed as all-electric buildings. Additions: Greater than 50% of existing building , then all equipment serving the addition shall be all-electric. Alterations: Greater than 50% of estimated value , then all equipment serving the alteration shall be all-electric. |
All new buildings will be constructed as all-electric buildings. Additions: Greater than 50% of existing building , then all equipment serving the addition shall be all-electric. Alterations: Greater than 50% of estimated value , then all equipment serving the alteration shall be all-electric. |
All new buildings will be constructed as all-electric buildings. Additions: Greater than 50% of existing building , then all equipment serving the addition shall be all-electric. Alterations: Greater than 50% of estimated value , then all equipment serving the alteration shall be all-electric. |
Residential: fireplaces/ fire pits, outdoor grills, pool and spa equipment, emergency generators Nonresidential: fireplaces/ fire pits, outdoor grills, pool and spa equipment, emergency generators. Buildings with public kitchens or specialized industry may apply for an exemption. |
||
This report was prepared for the California Statewide Codes & Standards Program. The program is funded by California utility customers and administered by Pacific Gas and Electric Company, San Diego Gas & Electric Company (SDG&E®), and Southern California Edison Company under the auspices of the California Public Utilities Commission and in support of the California Energy Commission. © 2024 Pacific Gas and Electric Company, San Diego Gas and Electric Company, and Southern California Edison. |
Jurisdiction | Ord. Type | Adopted Date | Single Family, Duplexes, and Townhouses | Multifamily | Nonresidential - Office | Nonresidential - Other | Exceptions | Ordinance |
---|---|---|---|---|---|---|---|---|
Agoura Hills | EV |
For each dwelling unit, install a listed raceway and a dedicated 208/240-volt branch circuit. |
New multifamily and Hotels/Motels projects with less than 20 dwelling units shall include 35% of spaces with Level 2 EV-Ready and 10% of spaces Level 2 EV-Capable. New multifamily and Hotels/Motels projects with greater than 20 dwelling units shall include 10% of spaces with Level 2 EVCS, 35% of spaces with Low Power Level 2 receptacles, and 10% of spaces Level 2 EV-Capable. |
New nonresidential buildings shall provide EV spaces in accordance to Table 5.106.5.3.1 (amended). |
New nonresidential buildings shall provide EV spaces in accordance to Table 5.106.5.3.1 (amended). |
Areas of parking facilities served by parking lifts or parking spaces accessible only by automated mechanical car parking systems. |
||
Albany | EV |
|
New multifamily construction shall include 20% of parking spaces with Level 2 EVCS and 80% of spaces shall be EV-Capable. |
|
|
|
||
Brisbane | EV |
All new buildings are required to provide one Level 2 EV-Ready parking space. If a second space is provided; it shall be a Level 1 EV-Ready space. |
New multifamily buildings shall provide one Level 2 EV-Ready space per dwelling unit. 50% of guest spaces shall be Level 2 EVSC. |
New nonresidential office buildings with more than 10 spaces shall include 15% of parking spaces with Level 2 EVCS and 10% of spaces Level 1 EV-Ready. |
New nonresidential buildings with more than 10 spaces shall include 15% of parking spaces with Level 2 EVCS, 10% of spaces Level 1 EV-Ready, and 25% of spaces EV-Capable. |
|
||
Burbank | EV |
All new buildings are required to provide one Level 2 EV-Ready parking space. |
New multifamily and Hotels/Motels projects shall include 40% of spaces with Low Power Level 2 EV-Ready. New multifamily and Hotels/Motels projects with greater than 20 dwelling units shall include 15% of spaces with Level 2 EVSE. |
Refer to Table 5.510 for EVSE and EV-Capable requirements |
||||
Burlingame | EV |
All new buildings are required to provide one Level 2 EV-Ready parking space. If a second space is provided; it shall be a Level 1 EV-Ready space. Additions: Parking additions or electrical panel upgrades must have reserved breaker spaces and electrical capacity to provide one Level 2 EV-Ready parking space and a Level 1 EV-Ready space if a second space is available. |
New multifamily buildings shall provide 40% of units with parking spaces with Level 2 EVCS. 60% of dwelling units with parking spaces shall be provided with a minimum Level 1 EV-Ready space. Additions: new parking facilities or electrical systems/lighting shall include 10% of new spaces with EVCS. Existing EV Capable spaces shall be upgraded to a minimum of Level 1 EV Ready. ALMS requirements. |
New nonresidential office buildings shall include 20% of parking spaces with Level 2 EVCS and 30% of spaces Level 2 EV-Capable. Additions: new parking facilities or electrical systems/lighting shall include 10% of new spaces with EVCS. Existing EV Capable spaces shall be upgraded to a minimum of Level 1 EV Ready. |
All other new nonresidential buildings shall include 10% of parking spaces with Level 2 EVCS and 10% of spaces Level 2 EV-Capable. Additions: new parking facilities or electrical systems/lighting shall include 10% of new spaces with EVCS. Existing EV Capable spaces shall be upgraded to a minimum of Level 1 EV Ready. |
ADU's and JADU's without additional parking facilities and without electrical panel upgrade or new panel installation. Where additional utility infrastructure costs increase construction costs by $4500 per space. |
||
Campbell | EV |
All new buildings (including ADU's) are required to provide one Level 2 EV-Ready and a Level 1 EV-Ready space. |
New multifamily buildings shall provide 40% of units with parking spaces with Level 2 EVCS. 60% of dwelling units with parking spaces shall be provided with a minimum Level 1 EV-Ready space. |
New nonresidential office buildings shall include 20% of parking spaces with Level 2 EVCS and 30% of spaces Level 2 EV-Capable. |
All other new nonresidential buildings shall include 10% of parking spaces with Level 2 EV-Ready and 10% of spaces Level 2 EV-Capable. |
|
||
Carlsbad | EV |
All new buildings are required to provide one Level 2 EV-Ready parking space. Alterations: permit valuation greater than $60,000 or include an electrical service panel upgrade are required to provide one Level 2 EV-Ready parking space |
New multifamily dwellings, major residential renovations to existing multifamily dwellings, hotels and motels, and new residential parking facilities shall provide 5% of spaces with Level 2 EVSE , 25% of spaces Level 2 EV-Ready, and 10% of spaces with EV-Capable. |
New nonresidential buildings shall provide EV spaces in accordance to Table 5.106.5.3.1 (amended). At least one EVCS shall be provided. |
New nonresidential buildings shall provide EV spaces in accordance to Table 5.106.5.3.1 (amended). At least one EVCS shall be provided. |
Accessory Dwelling Units (ADU) and Junior Accessory Dwelling Units (JADU) without additional parking facilities. |
||
Contra Costa County | EV |
New multifamily and Hotels/Motels projects with less than 20 dwelling units shall include 5% of spaces with Level 2 EVSE. Where common use parking is provided, at least one EV charger shall be located in the common use parking area and shall be available for use by all residents or guests. Additions/Alterations: the mandatory provisions of Section 4.106.4.2 may apply to additions or alterations of existing parking facilities or the addition of new parking facilities serving existing multifamily buildings. |
New nonresidential buildings shall provide EV spaces in accordance to Table 5.106.5.3.1 (amended). |
New nonresidential buildings shall provide EV spaces in accordance to Table 5.106.5.3.1 (amended). |
||||
Corte Madera | EV |
New residential buildings shall provide one Level 2 EV-Ready space. Additions/Alterations: projects requiring an electrical panel upgrade will provide a Level 2 EV-Ready receptacle. |
New multifamily buildings shall provide 15% of units with parking spaces with Level 2 EVCS. 85% of dwelling units with parking spaces shall be provided with a minimum Low Power Level 2 EV-Ready space. New Hotels/Motels shall provide 10 % of spaces with Level 2 EVSE, 35% of parking with Low Power Level 2 EV-Ready spaces, and 10% of spaces Level 1 EV-Capable. Additions/Alterations: projects requiring an electrical panel upgrade will provide 20% of spaces with Level 2 EV-Ready. EV requirements for parking lot modifications. |
|
New nonresidential construction are required to meet CALGreen Tier 1 level charging capability. Additions/Alterations: projects requiring an electrical panel upgrade will provide 20% of spaces with Level 2 EV-Ready. EV requirements for parking lot modifications. |
ADU's and JADU's without additional parking facilities. |
||
Cotati | EV |
For each dwelling unit, install a dedicated 208/240-volt branch circuit (Level 2 EV-Ready). |
New multifamily and Hotels/Motels shall include 50% of parking spaces with Low PowerLevel 2 EV-Ready receptacles and an additional 15% of parking spaces shall be Level 2 EVSE. In addition, multifamily developments with assigned parking must provide at least 50% of the assigned spaces with Low Power Level 2 receptacles. Additions: where new parking facilities or electrical systems/lighting of parking facilities are added or altered, 10% of new spaces shall be Level 2 EV-Capable. |
New nonresidential construction is required to meet CALGreen Tier 1 level charging capability. Table 5.106.5.3.1 Tier 1 or comply with Power allocation method and Table 5.106.5.3.2 Tier 1. At least one Level 2 EVSE shall be provided. Additions/Alterations: EV requirements for parking facilities upgrading the service panel or PV systems installed covering existing parking spaces. |
New nonresidential construction is required to meet CALGreen Tier 1 level charging capability. Table 5.106.5.3.1 Tier 1 or comply with Power allocation method and Table 5.106.5.3.2 Tier 1. At least one Level 2 EVSE shall be provided. Additions/Alterations: EV requirements for parking facilities upgrading the service panel or PV systems installed covering existing parking spaces. |
|||
Cudahy | EV |
For each dwelling unit, install a listed raceway and a dedicated 208/240-volt branch circuit. |
New multifamily and Hotels/Motels projects with less than 20 dwelling units shall include 5% of spaces with Level 2 EVCS (in addition to at least 1 common use EVCS), 30% of spaces with Low Power Level 2 receptacles, and 15% of spaces Level 2 EV-Capable. New multifamily and Hotels/Motels projects with greater than 20 dwelling units shall include 15% of spaces with Level 2 EVCS (in addition to at least 1 common use EVCS), 30% of spaces with Low Power Level 2 receptacles, and 15% of spaces Level 2 EV-Capable. Affordable Housing: reduced EV requirements. |
New nonresidential buildings shall provide EV spaces in accordance to Table 5.106.5.3.1 (amended). |
New nonresidential buildings shall provide EV spaces in accordance to Table 5.106.5.3.1 (amended). |
Areas of parking facilities served by parking lifts. An automatic load management system (ALMS) may be used to reduce the maximum required electrical capacity to each space served by the ALMS. |
||
Daly City | EV |
All new buildings are required to provide one Level 2 EV-Ready parking space. If a second space is provided; it shall be a Level 1 EV-Ready space. |
New multifamily buildings with less than 20 dwelling units shall provide one Level 2 EV-Ready space per unit. New multifamily buildings with greater than 20 dwelling units shall provide one Level 2 EV-Ready space for the first 20 units, provide 25% of units beyond that with a Level 2 EV-Ready space, AND remaining units with one Level 1 EV-Ready space. Affordable Housing: provide 10% of units with a Level 2 EV-Ready space, AND remaining units with one Level 1 EV-Ready space. Additions: new parking facilities or electrical systems/lighting shall include 10% of new spaces with Level 2 EV-Ready. |
New nonresidential office with more than 10 spaces shall include 10% of parking spaces with Level 2 EVCS, 10% of spaces Level 1 EV-Ready, and 30% of spaces EV-Capable. |
Other new nonresidential buildings with more than 10 spaces shall include 6% of parking spaces with Level 2 EVCS and 5% of spaces Level 1 EV-Ready. |
ADU's and JADU's without additional parking facilities. Where additional utility infrastructure costs increase construction costs by $4500 per space. |
||
Dublin | EV |
New residential buildings shall provide EV spaces as required by CALGreen Tier 2.
|
New residential buildings shall provide EV spaces as required by CALGreen Tier 2. |
New nonresidential buildings shall provide EV spaces as required by CALGreen Tier 2 (Table A5.106.5.3.1). |
New nonresidential buildings shall provide EV spaces as required by CALGreen Tier 2 (Table A5.106.5.3.1). |
|
||
East Palo Alto | EV |
All new buildings are required to provide one Level 2 EV-Ready parking space. If a second space is provided; it shall be a Level 1 EV-Ready space. Additions: parking additions or electrical panel upgrades must have reserved breaker spaces and electrical capacity for future EV charging. |
New multifamily buildings shall provide 40% of units with parking spaces with Level 2 EVCS. 60% of dwelling units with parking spaces shall be provided with a minimum Level 1 EV-Ready space. Additions: new parking facilities or electrical systems/lighting shall include 10% of new spaces with Level 2 EVCS. Existing EV Capable spaces shall be upgraded to a minimum of Level 1 EV Ready. |
New nonresidential office buildings shall include 20% of parking spaces with Level 2 EVCS and 30% of spaces Level 2 EV-Capable. Additions: new parking facilities or electrical systems/lighting shall include 10% of new spaces with Level 2 EVCS. Existing EV Capable spaces shall be upgraded to a minimum of Level 1 EV Ready. |
All other new nonresidential buildings shall include 10% of parking spaces with Level 2 EV-Ready and 10% of spaces Level 2 EV-Capable. Hotels/Motels buildings shall include 5% of spaces with Level 2 EVCS, 25% of spaces with Low Power Level 2 EV-Ready, and 10% of spaces with Low Power Level 2 EV-Capable. Additions: new parking facilities or electrical systems/lighting shall include 10% of new spaces with Level 2 EVCS. Existing EV Capable spaces shall be upgraded to a minimum of Level 1 EV Ready. |
ADU's and JADU's without additional parking facilities and without electrical panel upgrade or new panel installation. Where additional utility infrastructure costs increase construction costs by $4500 per space. |
||
El Monte | EV |
For each dwelling unit, install a listed raceway and a dedicated 208/240-volt branch circuit. |
New multifamily and Hotels/Motels projects with less than 20 dwelling units shall include 5% of spaces with Level 2 EVCS (in addition to at least 1 common use EVCS), 30% of spaces with Low Power Level 2 receptacles, and 15% of spaces Level 2 EV-Capable. New multifamily and Hotels/Motels projects with greater than 20 dwelling units shall include 15% of spaces with Level 2 EVCS (in addition to at least 1 common use EVCS), 30% of spaces with Low Power Level 2 receptacles, and 15% of spaces Level 2 EV-Capable. Affordable Housing: reduced EV requirements. |
New nonresidential buildings shall provide EV spaces in accordance to Table 5.106.5.3.1 (amended). |
New nonresidential buildings shall provide EV spaces in accordance to Table 5.106.5.3.1 (amended). |
Areas of parking facilities served by parking lifts. An automatic load management system (ALMS) may be used to reduce the maximum required electrical capacity to each space served by the ALMS. |
||
Encinitas | EV |
For each dwelling unit, install a listed raceway and a dedicated 208/240-volt branch circuit (Level 2). |
All new multifamily/Hotel buildings are required to provide Level 2 EVSE charging at 15% of parking spaces. Additions/Alterations of Hotels (buildings greater than 10,000 sq. ft.): required to provide Level 2 EVSE charging at 8% of parking spaces. |
All new buildings are required to provide Level 2 EVSE charging at 8% of parking spaces. Additions/Alterations (buildings greater than 10,000 sq. ft.): required to provide Level 2 EVSE charging at 8% of parking spaces. |
All new buildings are required to provide Level 2 EVSE charging at 8% of parking spaces. Additions/Alterations (buildings greater than 10,000 sq. ft.): required to provide Level 2 EVSE charging at 8% of parking spaces. |
|||
Fairfax | EV |
All new constructed buildings must meet CALGreen Tier 1 measures. Additions/Alterations: A project where the main electrical panel is upgraded shall comply with CALGreen Measure A4.106.8.1, Tier 1. |
New multifamily buildings shall provide 15% of units with parking spaces with Level 2 EVCS. 85% of dwelling units with parking spaces shall be provided with a minimum Low Power Level 2 EV-Ready space. Additions/Alterations: EV requirements for parking facilities upgrading the service panel or modifications to the parking lot surface (including removal of paving material and curbing.) |
New nonresidential construction are required to meet CALGreen Tier 1 level charging capability. Additions/Alterations: EV requirements for parking facilities upgrading the service panel or modifications to the parking lot surface (including removal of paving material and curbing.) |
ADU's and JADU's without additional parking facilities and without electrical panel upgrade or new panel installation. |
|||
Glendale | EV |
All new buildings are required to provide one Level 2 EV-Ready parking space. If a second space is provided; it shall be a Level 1 EV-Ready space. |
New multifamily buildings with less than 20 dwelling units shall provide 5% of spaces with Level 2 EVSE , 50% of spaces Level 2 EV-Ready, and 20% of spaces with Level 2 EV-Capable. New multifamily buildings with greater than 20 dwelling units shall provide 15% of spaces with Level 2 EVSE, 50% of spaces of Level 2 EV-Ready, 10% of spaces with Level 2 EV-Capable. |
|
New nonresidential and hotel construction are required to meet CALGreen Tier 2 level charging capability. |
ADU's and JADU's that do not have additional parking facilities and do not have an electrical panel upgrade or new panel installation.
|
||
Goleta | EV |
Install one Level 2 EV charging receptacle in one parking space. If a second parking space is provided, it shall be provided with a Level 1 EV Charging Receptacle and a listed raceway to accommodate a dedicated 208/240-volt branch circuit. Additions/Alterations: Parking additions or electrical panel upgrades must have reserved breaker spaces and electrical capacity for Level 2 charging receptacle(s). |
All dwelling units shall be provided with one Low Power Level 2 EV charging receptacle. 25% of unassigned or common use parking spaces shall also be equipped with Level 2 EV chargers. Hotels/Motels: 25% of the total number of parking spaces shall be equipped with Level 2 EV chargers. Additions/Alterations: Addition of parking facilities or alterations that include breaking ground on existing parking surfaces. |
New nonresidential buildings shall provide EV spaces in accordance to the CALGreen Intervening Cycle Changes: Table 5.106.5.3.1 (amended). |
New nonresidential buildings shall provide EV spaces in accordance to the CALGreen Intervening Cycle Changes: Table 5.106.5.3.1 (amended). |
See ordinance for exceptions |
||
Hayward | EV |
All new buildings are required to provide one Level 2 EV-Ready parking space. If a second space is provided; it shall be a Level 2 EV-Ready space. |
New multifamily buildings shall provide 20% of units with parking spaces with Level 2 EVCS, 80% of dwelling units with parking spaces shall be provided with a minimum Low Power Level 2 EV-Ready space. |
New nonresidential office buildings shall include 20% of parking spaces with Level 2 EVCS and 50% of spaces Level 2 EV-Capable. |
New hotels/motels shall provide 15% of units with parking spaces with Level 2 EVCS and 40% of units with parking spaces shall be provided with a Low Power Level 2 EV-Ready space. All other new nonresidential buildings shall include 10% of parking spaces with Level 2 EVCS and 20% of spaces Level 2 EV-Capable. |
|
||
Livermore | EV |
All new buildings are required to provide one Level 2 EV-Ready parking space. If a second space is provided; it shall be a Level 2 EV-Ready space. |
New multifamily buildings shall provide 15% of units with parking spaces with Level 2 EVCS. 85% of dwelling units with parking spaces shall be provided with a minimum Level 2 EV-Ready space. |
New nonresidential office buildings shall include 20% of parking spaces with Level 2 EVCS and 30% of spaces Level 2 EV-Capable. |
All other new nonresidential buildings shall include 10% of parking spaces with Level 2 EV-Ready and 10% of spaces Level 2 EV-Capable. Hotels/Motels buildings shall include 5% of spaces with Level 2 EVCS, 25% of spaces with Level 2 EV-Ready, and remaining 10% of spaces with Level 2 EV-Capable. |
ADU's without additional parking facilitie.
If construction costs would increase by an average of: $400 per parking space for affordable housing and non-profit organizations serving low income
|
||
Los Altos | EV |
All new buildings are required to provide one Level 2 EV-Ready parking space. If a second space is provided; it shall be a Level 2 EV-Ready space. |
New multifamily and Hotels/Motels projects with less than 20 dwelling units shall include 25% of units with Level 2 EVCS and the remaining units with Level 2 EV-Ready. New multifamily and Hotels/Motels projects with greater than 20 dwelling units shall include 25% of spaces with Level 2 EVCS and the remaining units with Level 2 EV-Ready. |
New nonresidential office and institutional buildings with more than 9 spaces shall include 50% of parking spaces with Level 2 EVCS, 20% of spaces Level 1 EV-Ready, and 30% of spaces Level 2 EV-Capable. |
New nonresidential office and institutional buildings with more than 9 spaces shall include 6% of parking spaces with Level 2 EVCS and 5% of spaces Level 1 EV-Ready. |
|
||
Los Angeles County | EV |
For each dwelling unit, install a listed raceway and a dedicated 208/240-volt branch circuit. |
New multifamily and Hotels/Motels projects with less than 20 dwelling units shall include 5% of spaces with Level 2 EVCS (in addition to at least 1 common use EVCS), 30% of spaces with Low Power Level 2 receptacles, and 15% of spaces Level 2 EV-Capable. New multifamily and Hotels/Motels projects with greater than 20 dwelling units shall include 15% of spaces with Level 2 EVCS (in addition to at least 1 common use EVCS), 30% of spaces with Low Power Level 2 receptacles, and 15% of spaces Level 2 EV-Capable. Affordable Housing: reduced EV requirements. |
New nonresidential buildings shall provide EV spaces in accordance to Table 5.106.5.3.1 (amended). |
New nonresidential buildings shall provide EV spaces in accordance to Table 5.106.5.3.1 (amended). |
Areas of parking facilities served by parking lifts. An automatic load management system (ALMS) may be used to reduce the maximum required electrical capacity to each space served by the ALMS. |
||
Los Gatos | EV |
All new buildings are required to provide one Level 2 EV-Ready parking space. If a second space is provided; it shall be a Level 1 EV-Ready space. Additions: parking additions or electrical panel upgrades must have reserved breaker spaces and electrical capacity for future EV charging. |
New multifamily buildings shall provide 40% of units with parking spaces with Level 2 EVCS. 60% of dwelling units with parking spaces shall be provided with a minimum Level 1 EV-Ready space. Additions: new parking facilities or electrical systems/lighting shall include 10% of new spaces with Level 2 EV-Capable. Existing EV Capable spaces shall be upgraded to a minimum of Level 1 EV Ready. ALMS requirements. |
New nonresidential office buildings shall include 20% of parking spaces with Level 2 EVCS and 30% of spaces Level 2 EV-Capable. Additions: new parking facilities or electrical systems/lighting shall include 10% of new spaces with Level 2 EV-Capable. Existing EV Capable spaces shall be upgraded to a minimum of Level 1 EV Ready. ALMS requirements. |
All other new nonresidential buildings shall include 10% of parking spaces with Level 2 EV-Ready and 10% of spaces Level 2 EV-Capable. Hotels/Motels buildings shall include 5% of spaces with Level 2 EVCS, 25% of spaces with Low Power Level 2 EV-Ready, and 10% of spaces with Low Power Level 2 EV-Capable. Additions: new parking facilities or electrical systems/lighting shall include 10% of new spaces with Level 2 EV-Capable. Existing EV Capable spaces shall be upgraded to a minimum of Level 1 EV Ready. ALMS requirements. |
ADU's and JADU's without additional parking facilities and without electrical panel upgrade or new panel installation. Where additional utility infrastructure costs increase construction costs by $4500 per space. |
||
Marin County | EV |
All new constructed buildings must meet CALGreen Tier 1 measures. Additions/Alterations: A project where the main electrical panel is upgraded shall comply with CALGreen Measure A4.106.8.1, Tier 1. |
New multifamily buildings shall provide 15% of units with parking spaces with Level 2 EVCS. 85% of dwelling units with parking spaces shall be provided with a minimum Low Power Level 2 EV-Ready space. New Hotels/Motels shall provide 10 % of spaces with Level 2 EVSE, 35% of parking with Low Power Level 2 EV-Ready spaces, and 10% of spaces Level 1 EV-Capable. Additions/Alterations: EV requirements for parking facilities upgrading the service panel or modifications to the parking lot surface (including removal of paving material and curbing.) |
New nonresidential construction are required to meet CALGreen Tier 1 level charging capability. Additions/Alterations: EV requirements for parking facilities upgrading the service panel or modifications to the parking lot surface (including removal of paving material and curbing.) |
ADU's and JADU's without additional parking facilities and without electrical panel upgrade or new panel installation. |
|||
Menlo Park | EV |
All new buildings are required to provide one Level 2 EV-Ready parking space. If a second space is provided; it shall be a Level 1 EV-Ready space. |
New multifamily buildings shall provide 15% of units with parking spaces with Level 2 EVCS. 85% of dwelling units with parking spaces shall be provided with a minimum Low Power Level 2 EV-Ready space. |
New nonresidential buildings shall provide EV spaces as required by CALGreen Tier 1 (Table A5.106.5.3.1). Additions/Alterations: shall provide EV spaces as required by Table 5.105.5.1 |
New nonresidential buildings shall provide EV spaces as required by CALGreen Tier 1 (Table A5.106.5.3.1). Additions/Alterations: shall provide EV spaces as required by Table 5.105.5.1 |
ADU's and JADU's without additional parking facilities. Where additional utility infrastructure costs increase construction costs by $4500 per space. |
||
Millbrae | EV |
All new buildings are required to provide one Level 2 EV-Ready parking space. If a second space is provided; it shall be a Level 1 EV-Ready space. |
New multifamily buildings with less than 20 dwelling units shall provide one Level 2 EV-Ready space per unit. New multifamily buildings with greater than 20 dwelling units shall provide one Level 2 EV-Ready space for the first 20 units, provide 25% of units beyond that with a Level 2 EV-Ready space, AND remaining units with one Level 1 EV-Ready space. Affordable Housing: provide 10% of units with a Level 2 EV-Ready space, AND remaining units with one Level 1 EV-Ready space.
|
New nonresidential office with more than 10 spaces shall include 10% of parking spaces with Level 2 EVCS, 10% of spaces Level 1 EV-Ready, and 30% of spaces EV-Capable. |
Other new nonresidential buildings with more than 10 spaces shall include 6% of parking spaces with Level 2 EVCS and 5% of spaces Level 1 EV-Ready. |
|
||
Milpitas | EV |
All new buildings are required to provide one Level 2 EV-Ready parking space. If a second space is provided; it shall be a Level 1 EV-Ready space. |
New multifamily buildings shall provide 25% of units with parking spaces with Level 2 EVCS. 75% of dwelling units with parking spaces shall be provide Low Power Level 2 EV-Ready space. Affordable Housing: New buildings shall provide 5% of units with parking spaces with Level 2 EVCS, 15% of parking spaces shall be provided with a minimum Low Power Level 2 EV-Ready space, and remaining spaces 80% Level 1 EV-Ready. Additions: when new spaces are added; 10% of new spaces with Level 2 EVCS. Existing EV Capable spaces shall be upgraded to a minimum of Level 1 EV Ready. ALMS requirements. |
New nonresidential office buildings with more than 10 spaces shall include 5% of parking spaces with Level 2 EVCS, 10% of spaces Level 1 EV-Ready, and 20% of spaces EV-Capable |
New nonresidential buildings with more than 10 spaces shall include 4% of parking spaces with Level 2 EVCS and 3% of spaces EV-Capable. Over 100 spaces; option for one 80kW Fast Charger per 100 spaces. |
ADU's and JADU's without additional parking facilities. |
||
Morgan Hill | EV |
All new buildings are required to provide one Level 2 EV-Ready parking space. If a second space is provided; it shall be a Level 1 EV-Ready space. Additions/Alterations: parking additions or electrical panel upgrades must have reserved panel capacity to accommodate parking per requirements of new construction. |
New multifamily buildings shall provide 40% of units with parking spaces with Level 2 EVCS. 60% of dwelling units with parking spaces shall be provided with a minimum Level 1 EV-Ready space. Additions/Alterations: permit valuation exceeding $1,000,000 shall upgrade 30% of spaces to EVCS OR 10% of of retrofit cost shall be spent toward EVCS. |
New nonresidential office buildings shall include 20% of parking spaces with Level 2 EVCS and 30% of spaces Level 2 EV-Capable. Additions/Alterations: permit valuation exceeding $1,000,000 shall upgrade 10% of spaces to EVCS OR 10% of of retrofit cost shall be spent toward EVCS. |
New hotel/motels shall include 10% of spaces with Level 2 EVCS, 25% of spaces with Low Power Level 2 EV-Ready, and remaining 10% of spaces with Low Power Level 2 EV-Capable. All other new nonresidential buildings shall include 10% of parking spaces with Level 2 EV-Ready and 10% of spaces Level 2 EV-Capable. Additions/Alterations: permit valuation exceeding $1,000,000 shall upgrade 10% of spaces to EVCS OR 10% of of retrofit cost shall be spent toward EVCS. |
ADU's and JADU's without additional parking facilities and without electrical panel upgrade or new panel installation. Where additional utility infrastructure costs increase construction costs by $4500 per space. |
||
Mountain View | EV |
All new buildings are required to provide one Level 2 EVCS parking space and a Level 1 EV-Ready space. Additions: Parking additions or electrical panel upgrades must have reserved breaker spaces and electrical capacity to provide one Level 2 EVCS parking space and a Level 1 EV-Ready. |
New multifamily buildings with 3 or more units shall provide 40% of units with parking spaces with Level 2 EVCS. 60% of dwelling units with parking spaces shall be provided with a minimum Level 2 EV-Ready space. A Level 3/DC Fast Charger shall be provided for every fraction of one hundred (100) spaces on site per Table 101.10. Additions: new parking facilities or electrical systems/lighting shall include 10% of new spaces with EVCS. Existing EV Capable spaces shall be upgraded to a minimum of Level 1 EV Ready. |
New nonresidential buildings shall provide EV spaces as required by CALGreen Tier 2 (Table A5.106.5.3.1). Additions: new parking facilities or electrical systems/lighting shall include 10% of new spaces with EVCS. Existing EV Capable spaces shall be upgraded to a minimum of Level 1 EV Ready. |
New nonresidential buildings shall provide EV spaces as required by CALGreen Tier 2 (Table A5.106.5.3.1). Additions: new parking facilities or electrical systems/lighting shall include 10% of new spaces with EVCS. Existing EV Capable spaces shall be upgraded to a minimum of Level 1 EV Ready. |
|
||
Napa County | EV |
For each dwelling unit, install a listed raceway and a dedicated 208/240-volt branch circuit. |
||||||
Pacifica | EV |
All new buildings are required to provide one Level 2 EV-Ready and a Level 1 EV-Ready circuit per dwelling. |
New multifamily buildings shall provide 15% of units with parking spaces with Level 2 EVCS. 85% of dwelling units with parking spaces shall be provided with a minimum Low Power Level 2 EV-Ready space.
|
New nonresidential office buildings shall include 20% of parking spaces with Level 2 EVCS and 30% of spaces Level 2 EV-Capable. |
All other new nonresidential buildings shall include 10% of parking spaces with Level 2 EVCS and 10% of spaces Level 2 EV-Capable. Requirements for Public Parking Lots and Overnight Accommodations. |
Residential: Affordable Housing buildings |
||
Palo Alto | EV |
Each residence shall be provided with one Level 2 EVSE or one Low Power Level 2 charging receptacle. |
New multifamily buildings shall provide at least one Level 2 EVSE or one Level 2 EV Ready space for each residential unit in the structure (Low Power Level 2 EV Charging Receptacle is acceptable for 60% of the total EV parking spaces) . Guest Parking: The property owner shall provide EV Capable Space, EV‐Ready Space, or EVSE Installed, for at least 25% of guest parking spaces, among which at least 10% shall be EVSE Installed. |
Exception for ADU's |
||||
Pleasanton | EV |
All new buildings are required to provide two Level 2 EV-Ready parking spaces; if two spaces are provided. |
New multifamily and Hotels/Motels projects with less than 20 dwelling units shall include 15% of units with Level 2 EVCS and the remaining units with Low Power Level 2 EV-Ready. Existing multifamily and Hotels/Motels projects with greater than 20 dwelling units who add new parking facilities shall include 10% of new spaces with EVCS. Existing EV-Capable spaces shall be upgraded to a minimum Level 1 EV-Ready.
|
New nonresidential office buildings shall include 20% of parking spaces with Level 2 EVCS and 30% of spaces Level 2 EV-Capable. Existing office buildings who add new parking facilities shall include 10% of new spaces with EVCS. Existing EV-Capable spaces shall be upgraded to a minimum Level 1 EV-Ready.
|
All other new nonresidential buildings shall include 10% of parking spaces with Level 2 EVCS and 10% of spaces Level 2 EV-Capable. Existing buildings who add new parking facilities shall include 10% of new spaces with EVCS. Existing EV-Capable spaces shall be upgraded to a minimum Level 1 EV-Ready. |
Accessory Dwelling Units( ADU) and Junior Accessory Dwelling Units( JADU) without additional parking facilities and without electrical panel upgrade or new panel installation.
|
||
Redwood City | EV |
All new buildings are required to provide one Level 2 EV-Ready parking space. If a second space is provided; it shall be a Level 1 EV-Ready space. |
New multifamily buildings shall provide 40% of units with parking spaces with Level 2 EVCS. 60% of dwelling units with parking spaces shall be provided with a minimum Level 1 EV-Ready space. |
New nonresidential Class B office buildings shall include 20% of parking spaces with Level 2 EVCS and 10% of spaces Level 2 EV-Capable. |
All other new nonresidential buildings shall include 10% of parking spaces with Level 2 EVCS and 10% of spaces Level 2 EV-Capable Hotels/Motels buildings shall include 5% of spaces with Level 2 EVCS, 25% of spaces with Low Power Level 2 EV-Ready, and remaining 10% of spaces with Low Power Level 2 EV-Capable. |
ADU's and JADU's without additional parking facilities and without electrical panel upgrade or new panel installation. Where additional utility infrastructure costs increase construction costs by $4500 per space. |
||
Rolling Hills | EV |
For each dwelling unit, install a listed raceway and a dedicated 208/240-volt branch circuit. |
New multifamily and Hotels/Motels projects with less than 20 dwelling units shall include 5% of spaces with Level 2 EVCS (in addition to at least 1 common use EVCS), 30% of spaces with Low Power Level 2 receptacles, and 15% of spaces Level 2 EV-Capable. New multifamily and Hotels/Motels projects with greater than 20 dwelling units shall include 15% of spaces with Level 2 EVCS (in addition to at least 1 common use EVCS), 30% of spaces with Low Power Level 2 receptacles, and 15% of spaces Level 2 EV-Capable. Affordable Housing: reduced EV requirements. |
New nonresidential buildings shall provide EV spaces in accordance to Table 5.106.5.3.1 (amended). |
New nonresidential buildings shall provide EV spaces in accordance to Table 5.106.5.3.1 (amended). |
Areas of parking facilities served by parking lifts. An automatic load management system (ALMS) may be used to reduce the maximum required electrical capacity to each space served by the ALMS. |
||
San Anselmo | EV |
All new constructed buildings must meet CALGreen Tier 1 measures. Additions/Alterations: A project where the main electrical panel is upgraded shall comply with CALGreen Measure A4.106.8.1, Tier 1. |
New multifamily buildings shall provide 15% of units with parking spaces with Level 2 EVCS. 85% of dwelling units with parking spaces shall be provided with a minimum Low Power Level 2 EV-Ready space. Additions/Alterations: EV requirements for parking facilities upgrading the service panel or modifications to the parking lot surface (including removal of paving material and curbing.) |
New nonresidential construction are required to meet CALGreen Tier 1 level charging capability. Additions/Alterations: EV requirements for parking facilities upgrading the service panel or modifications to the parking lot surface (including removal of paving material and curbing.) |
ADU's and JADU's without additional parking facilities and without electrical panel upgrade or new panel installation. |
|||
San Bruno | EV |
All new buildings (including ADU's) are required to provide one Level 2 EV-Ready parking space. If a second space is provided; it shall be a Level 1 EV-Ready space. |
New multifamily buildings and hotels/motels with less than 20 dwelling units shall provide 10% of spaces with Level 2 EVSE , 25% of spaces Level 2 EV-Ready, and 30% of spaces with Level 2 EV-Capable. New multifamily buildings and hotels/motels with greater than 20 dwelling units shall provide 10% of spaces with Level 2 EVSE, 25% of spaces of Level 2 EV-Ready, 30% of spaces with Level 2 EV-Capable.
|
|
|
|
||
San Carlos | EV |
All new buildings (including ADU's) are required to provide one Level 2 EV-Ready parking space. If a second space is provided; it shall be a Level 1 EV-Ready space. |
New multifamily buildings shall provide 40% of units with parking spaces with Level 2 EVCS. 60% of dwelling units with parking spaces shall be provided with a minimum Level 1 EV-Ready space. Existing buildings who add new parking facilities shall include 10% of new spaces with Level 2 EV-Ready.
|
New nonresidential office buildings shall include 10% of parking spaces with Level 2 EVCS, 10% of spaces Level 1 EV-Ready, and 30% of spaces EV-Capable. |
All other new nonresidential buildings shall include 10% of parking spaces with Level 2 EV-Ready and 10% of spaces Level 2 EV-Capable. Hotels/Motels buildings shall include 5% of spaces with Level 2 EVCS, 25% of spaces with Low Power Level 2 EV-Ready, and remaining 10% of spaces with Low Power Level 2 EV-Capable. |
Where there is no local utility power supply or the local utility is unable to supply adequate power. ADU's and JADU's without additional parking facilities. |
||
San Leandro | EV |
All new buildings are required to provide one Level 2 EV-Ready parking space. If a second space is provided; it shall be a Level 1 EV-Ready space. |
New multifamily buildings shall provide 40% of units with parking spaces with Level 2 EVCS. 60% of dwelling units with parking spaces shall be provided with a minimum Level 1 EV-Ready spac. Affordable Housing: new buildings shall provide 15% of units with parking spaces with Level 2 EVCS, 25% of dwelling units with parking spaces shall be provided with a minimum Low Power Level 2 EV-Ready space, and remaining spaces Level 1 EV-Ready. |
New nonresidential office buildings shall include 20% of parking spaces with Level 2 EVCS and 30% of spaces Level 2 EV-Capable. |
All other new nonresidential buildings shall include 10% of parking spaces with Level 2 EV-Ready and 10% of spaces Level 2 EV-Capable. |
|
||
San Mateo | EV |
All new buildings are required to provide one Level 2 EV-Ready parking space. If a second space is provided; it shall be a Level 1 EV-Ready space. |
New multifamily buildings shall provide 15% of units with parking spaces with Level 2 EVCS. 85% of dwelling units with parking spaces shall be provided with a minimum Low Power Level 2 EV-Ready space. Affordable Housing: new buildings shall provide 15% of units with parking spaces with Level 2 EVCS, 25% of dwelling units with parking spaces shall be provided with a minimum Low Power Level 2 EV-Ready space, and remaining spaces 60% Level 1 EV-Ready. Existing buildings who add new parking facilities or electrical systems/lighting shall include 10% of new spaces with Level 2 EV-Capable.
|
New nonresidential office buildings shall include 20% of parking spaces with Level 2 EVCS and 30% of spaces Level 2 EV-Capable. |
All other new nonresidential buildings shall include 10% of parking spaces with Level 2 EVCS and 10% of spaces Level 2 EV-Capable. |
New multifamily: where additional utility infrastructure costs increase construction costs by $4500 per space. ADU's and JADU's without additional parking facilities. |
||
San Rafael | EV |
For each dwelling unit, install a 40 ampere 208/240 volt dedicated receptacle. |
New multifamily buildings shall provide 15% of parking spaces with Level 2 EVCS. 85% of parking spaces shall be provided with a Low Power Level 2 EV receptacles. |
|||||
Santa Clara | EV |
All new buildings are required to provide one Level 2 EV-Ready parking space. If a second space is provided; it shall be a Level 1 EV-Ready space. For parking spaces not assigned to a dwelling unit: 25% of the unassigned parking space(s) shall be Level 2 EV Ready spaces, 75% of the unassigned space(s) shall be Low Power Level 2 EV Ready spaces. |
New multifamily and Hotel/Motel projects with less than 20 dwelling units shall include one parking space per dwelling unit with a Level 2 EV Ready space. All multifamily developments shall include secured bicycle parking with 110v electrical outlets. New multifamily projects with more than 20 dwelling units shall include one Level 2 EV-Ready parking space for the first 20 dwelling units, and for additional units: 25% of units shall provide one Level 2 EV-Ready space, 75% of units shall provide one Low Power Level 2 EV-Ready space . All multifamily developments shall include secured bicycle parking with 110v electrical outlets. Hotels/motels projects with more than 20 sleeping units shall include 10% of spaces with Level 2 EVCS. An additional 50% of spaces shall be EV-Capable. Affordable Housing: new buildings shall provide 10% of units with parking spaces with 1 Level 2 EV-Ready space, and remaining units with one Level 1 EV-Ready space.
|
|
New nonresidential buildings shall include 35% of parking spaces with Level 2 EVCS, and 35% of spaces Level 1 EV-Capable. |
|
||
Santa Monica | EV |
For each dwelling unit, install a listed raceway and a dedicated 208/240-volt branch circuit (Level 2). |
New multifamily and hotel/motel projects units shall provide 5% of spaces with Level 2 EVSE, 60% of spaces with Level 2 EV-Ready, and 10% Level 2 EV-Capable. Existing buildings who add new parking facilities or electrical systems/lighting shall include 10% of new spaces with Level 2 EV-Capable. |
New office buildings shall provide an additional 20% of Low Power Level 2 EV-Ready spaces. |
New nonresidential buildings shall provide EV spaces as required by CALGreen Tier 1 (Table A5.106.5.3.1). |
|||
Saratoga | EV |
All new buildings are required to provide one Level 2 EV-Ready and a Level 1 EV-Ready space. |
New multifamily buildings shall provide 40% of units with parking spaces with Level 2 EVCS. 60% of dwelling units with parking spaces shall be provided with a minimum Level 1 EV-Ready space. Additions: new parking facilities or electrical systems/lighting shall include 10% of new spaces with EVCS. Existing EV Capable spaces shall be upgraded to a minimum of Level 1 EV Ready. ALMS requirements. |
|
|
|
||
Solana Beach | EV |
For each dwelling unit, install a listed raceway and a dedicated 208/240-volt branch circuit (Level 2). |
New multifamily buildings and hotels/motels shall provide 25% of units with parking spaces with Level 2 EVCS. 75% of dwelling units with parking spaces shall be provided with a minimum Level 2 EV-Capable space. |
New nonresidential buildings shall provide 20% of units with parking spaces with Level 2 EVCS. 35% of parking spaces shall be Level 2 EV-Capable spaces. |
New nonresidential buildings shall provide 20% of units with parking spaces with Level 2 EVCS. 35% of parking spaces shall be Level 2 EV-Capable spaces. |
|||
Sunnyvale | EV |
All new buildings are required to provide one Level 2 EV-Ready parking space. If a second space is provided; it shall be a Level 1 EV-Ready space. |
New multifamily buildings shall provide 30% of units with parking spaces shall be Level 2 EV-Ready. 70% of remaining units shall provide Level 1 EV-Ready spaces. New Hotels/Motels shall provide 20% of parking with Level 2 EV-Ready spaces. 50% of spaces shall be Level 1 EV-Capable.
|
New nonresidential office buildings shall include 35% of parking spaces with Level 2 EVCS and 35% of spaces Level 1 EV-Capable. |
New nonresidential buildings shall include 35% of parking spaces with Level 2 EVCS, and 35% of spaces Level 1 EV-Capable. A Level 3 EVCS shall be provided for every 100 spaces.
|
ADU's and JADU's without additional parking facilities. |
||
This report was prepared for the California Statewide Codes & Standards Program. The program is funded by California utility customers and administered by Pacific Gas and Electric Company, San Diego Gas & Electric Company (SDG&E®), and Southern California Edison Company under the auspices of the California Public Utilities Commission and in support of the California Energy Commission. © 2024 Pacific Gas and Electric Company, San Diego Gas and Electric Company, and Southern California Edison. |
Jurisdiction | Ord. Type | Adopted Date | Single Family | Multifamily | Nonresidential | Exceptions | Ordinance |
---|---|---|---|---|---|---|---|
Campbell |
All newly constructed buildings shall include Zero-NOx emission water/space heating, cooking, and clothes drying equipment. Additions/Alterations: see ordinance text for remodel triggers |
All newly constructed buildings shall include Zero-NOx emission water/space heating, cooking, and clothes drying equipment. Additions/Alterations: see ordinance text for remodel triggers |
All newly constructed buildings shall include Zero-NOx emission water/space heating, cooking, and clothes drying equipment. Additions/Alterations: see ordinance text for remodel triggers |
Outdoor equipment and appliances that utilize a 5 gallon or smaller gas tank; and emergency equipment. Commercial cooking and businesses with gas dependent processes. |
|||
Los Altos Hills |
All newly constructed buildings, newly constructed detached accessory dwelling units, and other newly constructed detached habitable structures shall be constructed with Zero-NOx emissions equipment. Additions/Alterations: Projects that alter more than 50% percent of the structure’s permitted floor area, more than 50% of the permitted exterior wall area, 50% of the structure’s combined wall and floor area, or more than fifty (50) percent of existing structure’s permitted floor area is added. |
All newly constructed buildings, newly constructed detached accessory dwelling units, and other newly constructed detached habitable structures shall be constructed with Zero-NOx emissions equipment. Additions/Alterations: Projects that alter more than 50% percent of the structure’s permitted floor area, more than 50% of the permitted exterior wall area, 50% of the structure’s combined wall and floor area, or more than fifty (50) percent of existing structure’s permitted floor area is added. |
Indoor and outdoor cooking equipment, outdoor fireplaces, portable space heaters, generators, and pool/spa heaters. |
||||
This report was prepared for the California Statewide Codes & Standards Program. The program is funded by California utility customers and administered by Pacific Gas and Electric Company, San Diego Gas & Electric Company (SDG&E®), and Southern California Edison Company under the auspices of the California Public Utilities Commission and in support of the California Energy Commission. © 2024 Pacific Gas and Electric Company, San Diego Gas and Electric Company, and Southern California Edison. |